[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930169":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},930169,601,1,"单选题","在设备工程的实施过程中，总承包商与分包商的冲突原则上应由( )负责协调。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","承包商的项目经理",true,{"key":16,"text":17,"correct":18},"B","设备监理公司总经理",false,{"key":20,"text":21,"correct":18},"C","业主",{"key":23,"text":24,"correct":18},"D","设备监理机构总监理工程师","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]