[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930132":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},930132,601,1,"单选题","开展设备工程监理工作，实际操作过程中更为适宜的顺序应是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","承包合同在前，监理合同在后",false,{"key":16,"text":17,"correct":14},"B","监理合同、承包合同同时签订",{"key":19,"text":20,"correct":21},"C","监理合同在前，承包合同在后",true,{"key":23,"text":24,"correct":14},"D","承包合同签订5日内签订监理合同","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]