[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930126":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},930126,601,1,"单选题","实现目标过程的管理，首先进行的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","高层管理预定目标",false,{"key":16,"text":17,"correct":14},"B","确立下级目标",{"key":19,"text":20,"correct":14},"C","要向下级通报进度",{"key":22,"text":23,"correct":24},"D","定期检查",true,"",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]