[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930077":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},930077,601,1,"单选题","设备设计过程的设计输入应予以规定并形成文件，包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计采用的标准.规范及相关法规",false,{"key":16,"text":17,"correct":18},"B","以前类似设计提供的适用信息",true,{"key":20,"text":21,"correct":14},"C","分承包方的正式的组织和技术接口",{"key":23,"text":24,"correct":14},"D","项目的设计数据和基础资料","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]