[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930070":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},930070,601,1,"单选题","即使是同类项目，也会因时间、地点、环境、资源条件等方面的不同，做不到完全相同，因此很难将以往某个项目的建设过程完全复制。这体现了项目的( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","一次性",true,{"key":16,"text":17,"correct":18},"B","独特性",false,{"key":20,"text":21,"correct":18},"C","临时性",{"key":23,"text":24,"correct":18},"D","周期性","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]