[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930050":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},930050,601,1,"单选题","功能实现应包括项目的工程实现、技术实现、经济效果实现和社会效果实现。项目的社会效果实现包括( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","厂房、生产系统的建成",false,{"key":16,"text":17,"correct":14},"B","项目在经济上的可持续性或盈利性达到设计要求",{"key":19,"text":20,"correct":21},"C","项目最终能为社会带来效益，能与社会、环境相协调",true,{"key":23,"text":24,"correct":14},"D","技术水平达到最初的设计要求，能保证系统的安全、高效运作","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]