[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930002":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},930002,601,1,"单选题","按项目计划的作用不同，项目计划可分为( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","竞争性计划、指导性计划和操作性计划",true,{"key":16,"text":17,"correct":18},"B","进度计划、质量计划和投资计划",false,{"key":20,"text":21,"correct":18},"C","概念计划、详细计划和滚动计划",{"key":23,"text":24,"correct":18},"D","操作性计划、总体计划和分项子计划","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]