[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-929995":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},929995,601,1,"单选题","设备工程投资分析应以( )为基础。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","设备工程投资",false,{"key":16,"text":17,"correct":14},"B","工程造价",{"key":19,"text":20,"correct":21},"C","全寿命周期费用",true,{"key":23,"text":24,"correct":14},"D","工程投资","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]