[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-929984":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},929984,601,1,"单选题","在实际的项目风险管理过程中，应根据项目的具体情况选择其中的某一对策或某几个对策的组合。这些具体情况不包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","哪一方最能控制风险事件的发生",false,{"key":16,"text":17,"correct":18},"B","参与各方是否愿意参与风险管理",true,{"key":20,"text":21,"correct":14},"C","接受风险的一方提出的风险金是否合理",{"key":23,"text":24,"correct":14},"D","哪一方最能对发生的风险进行有效控制","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]