[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-929982":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},929982,601,1,"单选题","关于设计变更控制的基本要求，下列说法错误的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","所有变更活动都不应予以记录",true,{"key":16,"text":17,"correct":18},"B","对通用零部件的设计变更方法和步骤应作出专门的规定",false,{"key":20,"text":21,"correct":18},"C","设计变更应按规定的程序进行",{"key":23,"text":24,"correct":18},"D","只允许指定的设计负责人对其负责的图样及设计文件进行变更","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]