[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-929979":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},929979,601,1,"单选题","下列设备工程监理资料中，不属于设备工程制造、安装、调试过程的文件是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","定位测量资料",false,{"key":16,"text":17,"correct":18},"B","可行性研究报告",true,{"key":20,"text":21,"correct":14},"C","设备制造、安装材料的试验记录",{"key":23,"text":24,"correct":14},"D","技术措施、安全措施和环境保护措施","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]