[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-929939":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},929939,601,1,"单选题","围绕设备工程本体的设备工程管理层次，按照范围从小到大的顺序依次为( )",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","社会环境对项目的约束、承包商的项目管理、监理的项目管理、业主的项目管理",false,{"key":16,"text":17,"correct":14},"B","业主的项目管理、承包商的项目管理、监理的项目管理、社会环境对项目的约束",{"key":19,"text":20,"correct":14},"C","监理的项目管理、承包商的项目管理、业主的项目管理、社会环境对项目的约束",{"key":22,"text":23,"correct":24},"D","承包商的项目管理、监理的项目管理、业主的项目管理、社会环境对项目的约束",true,"",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]