[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-929929":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},929929,601,1,"单选题","项目目标的特点不包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","优先性",false,{"key":16,"text":17,"correct":18},"B","确定性",true,{"key":20,"text":21,"correct":14},"C","层次性",{"key":23,"text":24,"correct":14},"D","多目标性","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]