[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-929895":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},929895,601,1,"单选题","设备工程管理中常采用的PDCA循环管理方法的四个阶段先后是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","批复、行动、检测、总结",false,{"key":16,"text":17,"correct":18},"B","计划、实施、检查、处理",true,{"key":20,"text":21,"correct":14},"C","批准、对标、场检、安规",{"key":23,"text":24,"correct":14},"D","计划、实施、处理、分析","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]