[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-929535":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},929535,600,1,"单选题","关于屋面活荷载的规定，下列叙述不正确的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","屋面均布活荷载，不应与雪荷载同时组合",false,{"key":16,"text":17,"correct":14},"B","不上人的屋面，当施工或维修荷载较大时，应按实际情况采用；不同结构应按有关规范规定，将标准值0.5kN\u002Fm2作0.2kN\u002Fm2的增减",{"key":19,"text":20,"correct":14},"C","上人的屋面，当兼作其他用途时，应按相应楼面活荷载采用",{"key":22,"text":23,"correct":24},"D","对于因屋面排水不畅.堵塞等引起的积水荷载，应采取加固措施加以防止",true,"根据《建筑结构荷载规范》(GB 50009-2001)(2006年版)第4.3.1条及表4.3.1注释，对于因屋面排水不畅、堵塞等引起的积水荷载，应采取构造措施加以防止；必要时，应按积水的可能深度确定屋面活荷载。",{"id":6,"name":27,"category":28,"favorite":29},"(结构) 专业考试一级","建筑工程",0]