[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-929260":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},929260,600,1,"单选题","有一杂填土地基建筑场地，该土层无地下水，拟采用灰土挤密桩进行地基处理。已知地基挤密前土的平均干密度为1.54t\u002Fm3，挤密后桩间土的最大干密度为ρdmax=1.82t\u002Fm3，现采用桩孔直径为400mm，等边三角形布桩。则桩的间距应设计为（ ）m。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1.0",false,{"key":16,"text":17,"correct":18},"B","1.55",true,{"key":20,"text":21,"correct":14},"C","1.8",{"key":23,"text":24,"correct":14},"D","2.0","根据《建筑地基处理技术规范》（JGJ 79—2012）第7.5.2条第3款规定，桩孔直径为300mm~600mm。桩孔宜按等边三角形布置，桩孔之间的中心距离，可为桩孔直径的（2.0～3.0）倍，也可按下式进行估算： 已知地基挤密前土的平均干密度为： 桩径400mm，则可计算得桩间距为：",{"id":6,"name":27,"category":28,"favorite":29},"(结构) 专业考试一级","建筑工程",0]