[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-928234":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},928234,599,1,"单选题","某钢筋混凝土挑梁如图所示，l=1.5m，l1=2.8m，b=240mm，hb=300mm。挑出截面高度150mm，挑梁上墙体高度2.8m，墙厚h=240mm。墙端设有构造柱240mm×240mm，距墙边1.6m处开门洞，bh=900mm，hh=2100mm，楼板传给挑梁的荷载标准值为：梁端集中作用的恒载Fk=4.5kN，作用在挑梁挑出部分和埋入墙内部分的恒载g1k=17.75kN\u002Fm，g2k=10kN\u002Fm，作用在挑出部分的活载q1k=8.52kN\u002Fm，埋入墙内部分的活载q2k=4.95kN\u002Fm，挑梁挑出部分自重1.56kN\u002Fm，挑梁埋在墙内部分自重1.98kN\u002Fm，墙体自重19kN\u002Fm3。 1.楼层的倾覆力矩最接近于（ ）kN·m。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","50.24",true,{"key":16,"text":17,"correct":18},"B","54.4",false,{"key":20,"text":21,"correct":18},"C","58.25",{"key":23,"text":24,"correct":18},"D","62.7","挑梁埋在墙体的长度l1=2.8m＞2.2hb=2.2×0.3=0.66m； 根据《砌体结构设计规范》（GB 50003—2011）第7.4.2条第1款规定，挑梁计算倾覆点到墙外边缘的距离为：x0=0.3×0.3=0.09m＜0.13l1=0.13×2.8=0.364m； 根据第7.4.2条第3款规定，挑梁下有构造柱时，x0取一半，即x0=0.045m； 楼层倾覆力矩为：Mov=1.2×4.5×（1.5+0.045）+[1.4×8.52+1.2×（1.56+17.75）]×（1.5+0.045）2\u002F2=50.24kN·m。由此可知，A项数值最为接近。",{"id":6,"name":27,"category":28,"favorite":29},"(结构) 专业考试二级","建筑工程",0]