[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-927956":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},927956,599,1,"单选题","某一设有吊车的钢筋混凝土单层厂房，下柱长He＝11.5m。上下柱的截面尺寸如图所示。截面采用对称配筋，as＝a s′＝40mm。采用C30的混凝土，纵向钢筋为HRB335，内力组合后的最不利内力设计值，上柱是M＝112kN·m，N＝236kN；下柱是M＝400kN·m，N＝1200kN。 1.若已知上柱长Hu＝3.6m，则上柱的弯矩增大系数最接近于（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1.05",false,{"key":16,"text":17,"correct":14},"B","1.10",{"key":19,"text":20,"correct":21},"C","1.16",true,{"key":23,"text":24,"correct":14},"D","1.20","根据《混凝土结构设计规范》（GB 50010—2010）第6.2.20条表6.2.20-1可知，上柱的计算长度为：l0＝2Hu＝2×3.6＝7.2m；附加偏心距ea＝max{20，h\u002F30}＝max{20，13}＝20mm；轴向压力对截面重心的偏心距e0＝M\u002FN＝112000000\u002F236000＝475mm； 初始偏心距ei＝475＋20＝495mm；根据第6.2.4条式（6.2.4-4）计算，则截面曲率修正系数为： 取ζc＝1.0； 根据第6.2.4条式（6.2.4-3）计算，则上柱的弯矩增大系数为： 由此可知，C项数值最为接近。",{"id":6,"name":27,"category":28,"favorite":29},"(结构) 专业考试二级","建筑工程",0]