[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-598-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},598,"(结构) 专业基础考试一级","建筑工程",0,6,50,1746,[13,33,45,57,69,81,93,105,117,129,139,151,163,175,186,198,210,222,234,243,255,267,279,291,303,315,327,339,351,363,375,387,396,405,417,429,441,453,465,477,489,498,510,521,533,544,556,568,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":32},926318,1,"单选题","砌筑砂浆应随拌随用，必须在拌成后多长时间内使用完毕？",[19,23,27,29],{"key":20,"text":21,"correct":22},"A","3h",true,{"key":24,"text":25,"correct":26},"B","4h",false,{"key":28,"text":25,"correct":26},"C",{"key":30,"text":31,"correct":26},"D","6h","",{"id":34,"libraryId":5,"type":15,"typeLabel":16,"stem":35,"options":36,"answer":28,"analysis":32},926319,"同一验收批砂浆试块抗压强度平均值，按质量标准规定不得低于下述哪个强度？",[37,39,41,43],{"key":20,"text":38,"correct":26},"0. 75倍设计强度",{"key":24,"text":40,"correct":26},"设计强度",{"key":28,"text":42,"correct":22},"1. 10倍设计强度",{"key":30,"text":44,"correct":26},"1.15倍设计强度",{"id":46,"libraryId":5,"type":15,"typeLabel":16,"stem":47,"options":48,"answer":24,"analysis":32},926320,"砖墙砌体如需留槎时，应留斜槎，如墙高为 H，斜槎长度应为：",[49,51,53,55],{"key":20,"text":50,"correct":26},"1H",{"key":24,"text":52,"correct":22},"2H\u002F3",{"key":28,"text":54,"correct":26},"H\u002F2",{"key":30,"text":56,"correct":26},"H\u002F3",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":20,"analysis":32},926321,"混合结构每层承重墙、砖砌台阶水平面及砖砌体挑出层的最上一皮砖应如何砌筑？",[61,63,65,67],{"key":20,"text":62,"correct":22},"丁砖",{"key":24,"text":64,"correct":26},"顺砖",{"key":28,"text":66,"correct":26},"侧砖",{"key":30,"text":68,"correct":26},"立砖斜砌",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":28,"analysis":32},926322,"砖砌体工程在施工时，相邻施工段的砌筑高度差不宜超过一个楼层，也不宜大于多少？",[73,75,77,79],{"key":20,"text":74,"correct":26},"3m",{"key":24,"text":76,"correct":26},"5m",{"key":28,"text":78,"correct":22},"4m",{"key":30,"text":80,"correct":26},"4. 5m",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":30,"analysis":32},926323,"构造柱与砖墙接槎处，砖墙应砌成马牙槎，每一个马牙槎沿高度方向尺寸，不应超过：",[85,87,89,91],{"key":20,"text":86,"correct":26},"100mm",{"key":24,"text":88,"correct":26},"150mm",{"key":28,"text":90,"correct":26},"200mm",{"key":30,"text":92,"correct":22},"300mm",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":32},926324,"在砖砌体施工的质量检验中，对墙面垂直度偏差要求的允许值，每层是：",[97,99,101,103],{"key":20,"text":98,"correct":26},"3 mm",{"key":24,"text":100,"correct":22},"5mm",{"key":28,"text":102,"correct":26},"8mm",{"key":30,"text":104,"correct":26},"10mm",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":24,"analysis":32},926325,"按规范规定，首层室内地面以下或防潮层以下的混凝土小型空心砌块，应用混凝土填实，其强度最低不能小于：",[109,111,113,115],{"key":20,"text":110,"correct":26},"C15",{"key":24,"text":112,"correct":22},"C20",{"key":28,"text":114,"correct":26},"C30",{"key":30,"text":116,"correct":26},"C25",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":24,"analysis":32},926326,"在混凝土及钢筋混凝土芯柱施工中，待砌筑砂浆强度大于多少时，方可灌注芯柱混凝土？",[121,123,125,127],{"key":20,"text":122,"correct":26},"0. 5MPa",{"key":24,"text":124,"correct":22},"1MPa",{"key":28,"text":126,"correct":26},"1. 2MPa",{"key":30,"text":128,"correct":26},"1. 5MPa",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":32},926327,"小砌块墙体的搭砌长度不得少于块高的1\u002F3，且不应少于多少？",[133,135,137,138],{"key":20,"text":134,"correct":26},"80mm",{"key":24,"text":136,"correct":22},"90mm",{"key":28,"text":86,"correct":26},{"key":30,"text":90,"correct":26},{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":28,"analysis":32},926328,"砌砖通常采用“三一砌筑法”，其具体指的是：",[143,145,147,149],{"key":20,"text":144,"correct":26},"—皮砖，一层灰，一勾缝",{"key":24,"text":146,"correct":26},"—挂线，一皮砖，一勾缝",{"key":28,"text":148,"correct":22},"一块砖，一铲灰，一挤揉",{"key":30,"text":150,"correct":26},"—块砖，一铲灰，一刮缝",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":28,"analysis":32},926329,"砌筑地面以下砌体时，应使用的砂浆是：",[155,157,159,161],{"key":20,"text":156,"correct":26},"混合砂浆",{"key":24,"text":158,"correct":26},"石灰砂浆",{"key":28,"text":160,"correct":22},"水泥砂浆",{"key":30,"text":162,"correct":26},"纯水泥浆",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":20,"analysis":32},926330,"砖砌体的水平防潮层应设在何处？",[167,169,171,173],{"key":20,"text":168,"correct":22},"室内混凝土地面厚度范围内",{"key":24,"text":170,"correct":26},"室内地坪下三皮砖处",{"key":28,"text":172,"correct":26},"室内地坪上一皮砖处",{"key":30,"text":174,"correct":26},"室外地坪下一皮砖处",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":32},926331,"砌砖工程，设计要求的洞口宽度超过多少时，应设置过梁或砌筑平拱？",[179,180,182,184],{"key":20,"text":92,"correct":22},{"key":24,"text":181,"correct":26},"500mm",{"key":28,"text":183,"correct":26},"600mm",{"key":30,"text":185,"correct":26},"800mm",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":30,"analysis":32},926332,"在抗震烈度6度、7度设防地区，砖砌体留直槎时，必须设置拉结筋。下列中哪条叙述不正确？",[190,192,194,196],{"key":20,"text":191,"correct":26},"拉结筋的直径不小于6mm",{"key":24,"text":193,"correct":26},"每120mm墙厚设置一根拉结筋",{"key":28,"text":195,"correct":26},"应沿墙高不超过500mm设置一道拉结筋",{"key":30,"text":197,"correct":22},"拉结筋每边长不小于500mm，末端有90°弯钩",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":28,"analysis":32},926333,"在检验砖砌体工程质量中，下列哪一条是符合标准要求的？",[202,204,206,208],{"key":20,"text":203,"correct":26},"窗间墙的通缝皮数不超过4皮",{"key":24,"text":205,"correct":26},"每层砖砌体垂直度偏差小于30mm",{"key":28,"text":207,"correct":22},"水平灰缝砂衆饱满度不小于80%",{"key":30,"text":209,"correct":26},"拉结筋的直径不小于10mm",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":32},926334,"砌砖工程采用铺装法砌筑和施工期间气温超过30°C时，铺浆长度分别不得超过多少？",[214,216,218,220],{"key":20,"text":215,"correct":26},"700mm,500mm",{"key":24,"text":217,"correct":22},"750mm, 500mm",{"key":28,"text":219,"correct":26},"500mm,300mm",{"key":30,"text":221,"correct":26},"600mm,400mm",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":28,"analysis":32},926335,"施工时所用的小型砌块和产品的龄期不得小于多少天？",[226,228,230,232],{"key":20,"text":227,"correct":26},"7",{"key":24,"text":229,"correct":26},"14",{"key":28,"text":231,"correct":22},"28",{"key":30,"text":233,"correct":26},"30",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":30,"analysis":32},926336,"用加气混凝土砌块砌筑墙体时，墙底部应使用普通砖砌筑，砌筑高度不小于：",[238,239,240,242],{"key":20,"text":86,"correct":26},{"key":24,"text":88,"correct":26},{"key":28,"text":241,"correct":26},"180mm",{"key":30,"text":90,"correct":22},{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":28,"analysis":32},926337,"砖砌平拱过梁，拱脚应深入墙内不小于多少，拱底应有多大的起拱？",[247,249,251,253],{"key":20,"text":248,"correct":26},"10mm,0. 5%",{"key":24,"text":250,"correct":26},"15mm,0. 8%",{"key":28,"text":252,"correct":22},"20mm,1%",{"key":30,"text":254,"correct":26},"25mm,2%",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":24,"analysis":32},926338,"单位工程施工组织设计的核心内容是：",[259,261,263,265],{"key":20,"text":260,"correct":26},"确定施工进度计划",{"key":24,"text":262,"correct":22},"B选择施工方案",{"key":28,"text":264,"correct":26},"设计施工现场平面布置图",{"key":30,"text":266,"correct":26},"确定施工准备工作计划",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":30,"analysis":32},926339,"下列中哪一项不是评价单位工程施工进度计划质量的指标？",[271,273,275,277],{"key":20,"text":272,"correct":26},"工期",{"key":24,"text":274,"correct":26},"资源消耗的均衡性",{"key":28,"text":276,"correct":26},"主要施工机械的利用率",{"key":30,"text":278,"correct":22},"劳动消耗量",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":28,"analysis":32},926340,"在单位工程施工平面图设计步骤中，首先应考虑下列中的哪一项？",[283,285,287,289],{"key":20,"text":284,"correct":26},"运输道路的布置",{"key":24,"text":286,"correct":26},"材料、构件仓库、堆场布置",{"key":28,"text":288,"correct":22},"起重机械的布置",{"key":30,"text":290,"correct":26},"水电管网的布置",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":20,"analysis":32},926341,"单位工程施工方案选择的内容应为下列中哪一项？",[295,297,299,301],{"key":20,"text":296,"correct":22},"选择施工方法和施工机械，确定工程开展顺序",{"key":24,"text":298,"correct":26},"选择施工方法，确定施工进度计划",{"key":28,"text":300,"correct":26},"选择施工方法和施工机械，确定资源供应计划",{"key":30,"text":302,"correct":26},"选择施工方法，确定进度计划及现场平面布置",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":30,"analysis":32},926342,"在安排各施工过程的施工顺序时，可以不考虑下列中的哪一项？",[307,309,311,313],{"key":20,"text":308,"correct":26},"施工工艺的要求",{"key":24,"text":310,"correct":26},"施工组织的要求",{"key":28,"text":312,"correct":26},"施工质量的要求",{"key":30,"text":314,"correct":22},"施工人员数量的要求",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":28,"analysis":32},926343,"某施工段的工程量为200单位，可安排的施工队人数为25人，每人每天完成0. 8 个单位，则该队在该段中的流水节拍应是：",[319,321,323,325],{"key":20,"text":320,"correct":26},"12d",{"key":24,"text":322,"correct":26},"8d",{"key":28,"text":324,"correct":22},"10d",{"key":30,"text":326,"correct":26},"6d",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":28,"analysis":32},926344,"对有技术间歇的分层分段流水施工，最少施工段数与施工过程数相比，应：",[331,333,335,337],{"key":20,"text":332,"correct":26},"小于",{"key":24,"text":334,"correct":26},"等于",{"key":28,"text":336,"correct":22},"大于",{"key":30,"text":338,"correct":26},"小于、等于",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":30,"analysis":32},926345,"在加快成倍节拍流水中，任何两个相邻专业施工队间的流水步距应是所有流水节拍的？",[343,345,347,349],{"key":20,"text":344,"correct":26},"最小值",{"key":24,"text":346,"correct":26},"最小公倍数",{"key":28,"text":348,"correct":26},"最大值工",{"key":30,"text":350,"correct":22},"最大公约数",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":24,"analysis":32},926346,"流水施工中，流水节拍是指下列叙述中的哪一种？",[355,357,359,361],{"key":20,"text":356,"correct":26},"—个施工过程在各个施工段上的总持续时间",{"key":24,"text":358,"correct":22},"—个施工过程在一个施工段上的持续工作时间",{"key":28,"text":360,"correct":26},"两个相邻施工过程先后进入流水施工段的时间间隔",{"key":30,"text":362,"correct":26},"流水施工的工期",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":30,"analysis":32},926347,"在施工段的划分中，下列中哪项要求是不正确？",[367,369,371,373],{"key":20,"text":368,"correct":26},"施工段的分界同施工对象的结构界限尽量一致",{"key":24,"text":370,"correct":26},"各施工段上所消耗的劳动量尽量相近",{"key":28,"text":372,"correct":26},"要有足够的工作面",{"key":30,"text":374,"correct":22},"分层又分段时，每层施工段数应少于施工过程数",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":28,"analysis":32},926348,"下列哪项不属于确定流水步距的基本要求？",[379,381,383,385],{"key":20,"text":380,"correct":26},"始终保持两个施工过程的先后工艺顺序",{"key":24,"text":382,"correct":26},"保持各施工过程的连续作业",{"key":28,"text":384,"correct":22},"始终保持各工作面不空闲",{"key":30,"text":386,"correct":26},"使前后两施工过程施工时间有最大搭接",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":20,"analysis":32},926349,"某二层楼进行固定节拍专业流水施工，每层施工段数为3，施工过程有3个，流水节拍为2d，流水工期为：",[391,393,394,395],{"key":20,"text":392,"correct":22},"16d",{"key":24,"text":324,"correct":26},{"key":28,"text":320,"correct":26},{"key":30,"text":322,"correct":26},{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":28,"analysis":32},926350,"某流水施工组织成加快成倍节拍流水，施工段数为6，甲、乙、丙三个施工过程的流水节拍分别为1d、2d和3d，其流水工期为：",[400,401,402,404],{"key":20,"text":322,"correct":26},{"key":24,"text":324,"correct":26},{"key":28,"text":403,"correct":22},"11d",{"key":30,"text":392,"correct":26},{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":30,"analysis":32},926351,"某工程按下表要求组织流水施工，相应流水步距KⅠ-Ⅱ及KⅡ-Ⅲ分别应为多少天？",[409,411,413,415],{"key":20,"text":410,"correct":26},"2,2",{"key":24,"text":412,"correct":26},"2,3",{"key":28,"text":414,"correct":26},"3,3",{"key":30,"text":416,"correct":22},"5,2",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":24,"analysis":32},926352,"单代号网络图中，某工作最早完成时间与其紧后工作的最早开始时间之差为：",[421,423,425,427],{"key":20,"text":422,"correct":26},"总时差",{"key":24,"text":424,"correct":22},"自由时差",{"key":28,"text":426,"correct":26},"虚工作",{"key":30,"text":428,"correct":26},"时间间隔",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":28,"analysis":32},926353,"双代号网络图的三要素是：",[433,435,437,439],{"key":20,"text":434,"correct":26},"时差、最早时间和最迟时间",{"key":24,"text":436,"correct":26},"总时差、局部时差和计算工期",{"key":28,"text":438,"correct":22},"工作、事件和线路",{"key":30,"text":440,"correct":26},"工作、事件和关键线路",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":20,"analysis":32},926354,"双代号网络图中，某非关键工作的拖延时间不超过局部时差，则应有下列中哪种结果？",[445,447,449,451],{"key":20,"text":446,"correct":22},"后续工作最早可能开始时间不变",{"key":24,"text":448,"correct":26},"仅改变后续工作最早可能开始时间",{"key":28,"text":450,"correct":26},"后续工作最迟必须开始时间改变",{"key":30,"text":452,"correct":26},"紧后工作最早可能开始时间改变",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":32},926355,"某工程双代号网络图如图所示，工作①→③的局部时差应为：",[457,459,461,463],{"key":20,"text":458,"correct":26},"1d",{"key":24,"text":460,"correct":22},"2d",{"key":28,"text":462,"correct":26},"3d",{"key":30,"text":464,"correct":26},"4d",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":32},926356,"在单代号网络图中，用下列中哪项表示工作之间的逻辑关系？",[469,471,473,475],{"key":20,"text":470,"correct":26},"虚箭杆",{"key":24,"text":472,"correct":22},"实箭杆",{"key":28,"text":474,"correct":26},"节点",{"key":30,"text":476,"correct":26},"B与C",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":28,"analysis":32},926357,"某项工作有两项紧后工作D和 E，D的最迟完成时间是20d，持续时间是13d；E的最迟完成时间是15d，持续时间是10d。则本工作的最迟完成时间是：",[481,483,485,487],{"key":20,"text":482,"correct":26},"20d",{"key":24,"text":484,"correct":26},"15d",{"key":28,"text":486,"correct":22},"5d",{"key":30,"text":488,"correct":26},"13d",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":24,"analysis":32},926358,"在网络计划中，下列中哪项为零，则该工作必为关键工作？",[493,494,495,496],{"key":20,"text":424,"correct":26},{"key":24,"text":422,"correct":22},{"key":28,"text":428,"correct":26},{"key":30,"text":497,"correct":26},"工作持续时间",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":28,"analysis":32},926359,"双代号网络图中引入虚工作的一个原因是为了表达什么？",[502,504,506,508],{"key":20,"text":503,"correct":26},"表达不需消耗时间的工作",{"key":24,"text":505,"correct":26},"表达不需消耗资源的工作",{"key":28,"text":507,"correct":22},"表达工作间的逻辑关系",{"key":30,"text":509,"correct":26},"节省箭线和节点",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":32},926360,"双代号网络图中，某非关键工作被拖延了2d，其自由时差为1d，总时差为3d，则会出现下列中哪项结果？",[514,515,517,519],{"key":20,"text":446,"correct":26},{"key":24,"text":516,"correct":22},"将改变后续工作最早可能开始时间",{"key":28,"text":518,"correct":26},"会影响总工期",{"key":30,"text":520,"correct":26},"要改变紧前工作的最早可能开始时间",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":32},926361,"下列中哪项制度是施工企业技术管理的一项重要基础工作？",[525,527,529,531],{"key":20,"text":526,"correct":22},"技术管理",{"key":24,"text":528,"correct":26},"预结算",{"key":28,"text":530,"correct":26},"合同管理",{"key":30,"text":532,"correct":26},"图纸会审",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":28,"analysis":32},926362,"图纸会审工作是属于哪方面的管理工作？",[537,539,541,542],{"key":20,"text":538,"correct":26},"计划管理",{"key":24,"text":540,"correct":26},"现场施工管理",{"key":28,"text":526,"correct":22},{"key":30,"text":543,"correct":26},"工资管理",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":32},926364,"竣工验收的组织者是：",[548,550,552,554],{"key":20,"text":549,"correct":26},"施工单位",{"key":24,"text":551,"correct":22},"建设单位",{"key":28,"text":553,"correct":26},"设计单位",{"key":30,"text":555,"correct":26},"质检单位",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":30,"analysis":32},926365,"下列中哪种文件不是竣工验收的依据？",[560,562,564,566],{"key":20,"text":561,"correct":26},"施工图纸",{"key":24,"text":563,"correct":26},"有关合同文件",{"key":28,"text":565,"correct":26},"设计修改签证",{"key":30,"text":567,"correct":22},"施工日志",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":30,"analysis":32},926366,"在填方工程中，如采用透水性不同的土料分层填筑时，下层宜填筑：",[572,574,576,578],{"key":20,"text":573,"correct":26},"渗透系数极小的填料",{"key":24,"text":575,"correct":26},"渗透系数较小的填料",{"key":28,"text":577,"correct":26},"渗透系数中等的填料",{"key":30,"text":579,"correct":22},"渗透系数较大的填料",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":28,"analysis":32},926367,"在湿度正常的轻亚粘土及亚粘土中开挖基坑或管沟，可做成直立壁不加支撑的深度规定是：",[584,586,588,590],{"key":20,"text":585,"correct":26},"≤0. 5m",{"key":24,"text":587,"correct":26},"≤1. 0m",{"key":28,"text":589,"correct":22},"≤1. 25m",{"key":30,"text":591,"correct":26},"≤1. 5m",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":32},926368,"沟槽开挖在5m以上时，对松散和湿度很高的土进行土壁支撑，应采用下列中的哪种支撑？",[596,598,600,602],{"key":20,"text":597,"correct":26},"断续式水平挡土板支撑",{"key":24,"text":599,"correct":22},"垂直挡土板式支撑",{"key":28,"text":601,"correct":26},"连续式水平挡土板支撑",{"key":30,"text":603,"correct":26},"断续或连续式水平挡土板支撑",[605,608,611,614,617,620],{"id":15,"name":606,"category":7,"favorite":607},"领导干部任职前廉政法规知识测试题",92,{"id":609,"name":610,"category":7,"favorite":15},595,"建筑结构与设备",{"id":612,"name":613,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":615,"name":616,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":618,"name":619,"category":7,"favorite":8},534,"BIM工程师",{"id":621,"name":619,"category":7,"favorite":8},535]