[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-598-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},598,"(结构) 专业基础考试一级","建筑工程",0,5,50,1746,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,201,213,225,237,249,261,273,285,297,309,321,333,344,356,368,377,386,398,410,419,431,443,455,467,479,491,500,512,524,536,548,560,572,584,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},926268,1,"单选题","建筑场地较小时，采用建筑基线作为平面控制，其基线点数不应少于多少？",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","2",false,{"key":24,"text":25,"correct":26},"B","3",true,{"key":28,"text":29,"correct":22},"C","4",{"key":31,"text":32,"correct":22},"D","5","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},926269,"建筑物变形观测主要包括下列中的哪些观测？",[38,40,42,44],{"key":20,"text":39,"correct":22},"沉降观测、位移观测",{"key":24,"text":41,"correct":22},"倾斜观测、裂缝观测",{"key":28,"text":43,"correct":22},"沉降观测、裂缝观测",{"key":31,"text":45,"correct":26},"A和B",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},926270,"施工测量中平面控制网的形式有下列中的哪几种？ Ⅰ.平板仪导线 Ⅱ.建筑方格网 Ⅲ.多边形网 Ⅳ.建筑基线 Ⅴ.视距导线 Ⅵ.导线网",[50,52,54,56],{"key":20,"text":51,"correct":22},"Ⅰ、Ⅱ、Ⅲ、Ⅳ",{"key":24,"text":53,"correct":22},"Ⅰ、Ⅲ、Ⅴ、Ⅵ",{"key":28,"text":55,"correct":26},"Ⅱ、Ⅲ、Ⅳ、Ⅵ",{"key":31,"text":57,"correct":22},"Ⅲ、Ⅳ、Ⅴ、Ⅵ",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},926271,"高层建筑竖向投测的精度要求随结构形式、施工方法和高度不同而异，其投测方法一般采用下列中的哪几种方法？ Ⅰ.经纬仪投测法Ⅱ.光学垂准仪法 Ⅲ.极坐标法 Ⅳ.前方交会法 Ⅴ.激光准直仪法Ⅵ.水准仪高程传递法",[62,64,66,68],{"key":20,"text":63,"correct":22},"Ⅰ、Ⅱ、Ⅳ",{"key":24,"text":65,"correct":26},"Ⅰ、Ⅲ、Ⅴ",{"key":28,"text":67,"correct":22},"Ⅱ、Ⅲ、Ⅴ",{"key":31,"text":69,"correct":22},"Ⅲ、Ⅴ、Ⅵ",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},926272,"从测量平面直角坐标系的规定判断，下列中哪一项叙述是正确的？",[74,76,78,80],{"key":20,"text":75,"correct":22},"象限与数学坐标象限编号方向一致",{"key":24,"text":77,"correct":26},"X轴为纵坐标，Y轴为横坐标",{"key":28,"text":79,"correct":22},"方位角由横坐标轴逆时针量测",{"key":31,"text":81,"correct":22},"东西方向为X轴，南北方向为Y轴",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},926273,"测量工作的基本原则是从整体到局部，从高级到低级，还有下列中的哪一项原则？",[86,88,90,92],{"key":20,"text":87,"correct":26},"从控制到碎部",{"key":24,"text":89,"correct":22},"从碎部到控制",{"key":28,"text":91,"correct":22},"控制与碎部并存",{"key":31,"text":93,"correct":22},"测图与放样并存",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},926274,"水准面上任一点的铅垂线都与该面相垂直，水准面是由自由静止的海水面向大陆、岛屿内延伸而成的，形成下列中的哪一种面？",[98,100,102,104],{"key":20,"text":99,"correct":26},"闭合曲面",{"key":24,"text":101,"correct":22},"水平面",{"key":28,"text":103,"correct":22},"参考椭球体",{"key":31,"text":105,"correct":22},"圆球体",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},926275,"某点到大地水准面的铅垂距离对该点称为：",[110,112,114,116],{"key":20,"text":111,"correct":22},"相对高程",{"key":24,"text":113,"correct":22},"高差",{"key":28,"text":115,"correct":22},"标高",{"key":31,"text":117,"correct":26},"绝对高程",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},926276,"目前中国采用统一的测量高程是指：",[122,124,126,128],{"key":20,"text":123,"correct":22},"渤海高程系",{"key":24,"text":125,"correct":22},"1956高程系",{"key":28,"text":127,"correct":26},"1985国家高程基准",{"key":31,"text":129,"correct":22},"黄海高程系",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},926277,"北京某点位于东经116°28、北纬39°54，则该点所在6°带的带号及中央子午线的经度分别为：",[134,136,138,140],{"key":20,"text":135,"correct":22},"20、120°",{"key":24,"text":137,"correct":26},"20、117°",{"key":28,"text":139,"correct":22},"19、111°",{"key":31,"text":141,"correct":22},"19、117°",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},926278,"已知M点所在6°带的高斯坐标值为，xm= 366712. 48m，ym=21331229. 75m，则M点位于：",[146,148,150,152],{"key":20,"text":147,"correct":22},"21°带，在中央子午线以东",{"key":24,"text":149,"correct":22},"36°带，在中央子午线以东",{"key":28,"text":151,"correct":26},"21°带，在中央子午饯以西",{"key":31,"text":153,"correct":22},"36°带，在中央子午线以西",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},926279,"浇筑混凝土单向板时，施工缝应留置在：",[158,160,162,164],{"key":20,"text":159,"correct":26},"中间1\u002F3跨度范围内且平行于板的长边",{"key":24,"text":161,"correct":22},"平行于板的长边的任何位置",{"key":28,"text":163,"correct":22},"平行于板的短边的任何位置",{"key":31,"text":165,"correct":22},"中间1\u002F3跨度范围内",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},926280,"跨度为6m的现浇钢筋混凝土梁，当混凝土强度达到设计强度标准值的多少时，方可拆除底模板？",[170,172,174,176],{"key":20,"text":171,"correct":22},"50%",{"key":24,"text":173,"correct":22},"60%",{"key":28,"text":175,"correct":26},"75%",{"key":31,"text":177,"correct":22},"100%",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},926281,"关于梁模板拆除的一般顺序，下面所述哪个正确？ Ⅰ.先支的先拆，后支的后拆 Ⅱ.先支的后拆，后支的先拆 Ⅲ.先拆除承重部分，后拆除非承重部分 Ⅳ.先拆除非承重部分，后拆除承重部分.",[182,184,186,188],{"key":20,"text":183,"correct":22},"Ⅰ、Ⅲ",{"key":24,"text":185,"correct":26},"Ⅱ、Ⅳ",{"key":28,"text":187,"correct":22},"Ⅰ、Ⅳ",{"key":31,"text":189,"correct":22},"Ⅱ、Ⅲ",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},926282,"钢筋绑扎接头的位置应相互错开，从任一绑扎接头中心至搭接长度的1. 3倍区段范围内，有绑扎接头的受力钢筋截面面积占受力钢筋总截面面积的百分率，在受拉区中不得超过：",[194,196,198,200],{"key":20,"text":195,"correct":26},"25%",{"key":24,"text":197,"correct":22},"30%",{"key":28,"text":199,"correct":22},"40%",{"key":31,"text":171,"correct":22},{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},926283,"用作预应力筋的钢筋冷拉时，应采用的方法是：",[205,207,209,211],{"key":20,"text":206,"correct":22},"控制冷拉率法",{"key":24,"text":208,"correct":26},"双控法",{"key":28,"text":210,"correct":22},"单控法",{"key":31,"text":212,"correct":22},"无须控制",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},926284,"根据钢筋电弧焊接头方式的不同，焊接可分为：",[217,219,221,223],{"key":20,"text":218,"correct":26},"搭接焊、帮条焊、坡口焊",{"key":24,"text":220,"correct":22},"电渣压力焊、埋弧压力焊",{"key":28,"text":222,"correct":22},"对焊、点焊、电弧焊",{"key":31,"text":224,"correct":22},"电渣压力焊、埋弧压力焊、气压焊",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},926285,"泵送50m高的混凝土粗集料宜选用卵石，且其最大粒径与输送管内径之比最大为：",[229,231,233,235],{"key":20,"text":230,"correct":22},"1 : 2",{"key":24,"text":232,"correct":22},"1 ： 3",{"key":28,"text":234,"correct":26},"1 : 2. 5",{"key":31,"text":236,"correct":22},"1 : 5",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":28,"analysis":33},926286,"在进行钢筋混凝土实心板的施工过程中，对混凝土集料最大粒径的要求，下面哪一项是正确的？",[241,243,245,247],{"key":20,"text":242,"correct":22},"集料的最大粒径不超过板厚最小尺寸的1\u002F4，且不得超过60mm",{"key":24,"text":244,"correct":22},"集料的最大粒径不超过板厚最小尺寸的2\u002F4，且不得超过60mm",{"key":28,"text":246,"correct":26},"集料的最大粒径不超过板厚最小尺寸的1\u002F3，且不得超过40mm",{"key":31,"text":248,"correct":22},"集料的最大粒径不超过板厚最小尺寸的2\u002F3，且不得超过60mm",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},926287,"当采用插入式振捣器时，混凝土浇筑层厚度应控制为：",[253,255,257,259],{"key":20,"text":254,"correct":26},"振揭器振动部分的1. 25倍",{"key":24,"text":256,"correct":22},"150mm",{"key":28,"text":258,"correct":22},"200mm",{"key":31,"text":260,"correct":22},"250mm",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":28,"analysis":33},926288,"在钢筋混凝土肋梁楼盖施工中，若沿主梁方向浇混凝土，则施工缝应留在梁的什么位置？",[265,267,269,271],{"key":20,"text":266,"correct":22},"主梁跨中2\u002F4范围内",{"key":24,"text":268,"correct":22},"板的跨中2\u002F4范围内",{"key":28,"text":270,"correct":26},"主梁跨中2\u002F4范围与板跨中2\u002F4范围内的重合处",{"key":31,"text":272,"correct":22},"靠近梁边在梁跨度的1\u002F4处",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},926289,"混凝土运输、浇筑及间歇的全部时间不允许超过下述中哪个时间？",[277,279,281,283],{"key":20,"text":278,"correct":22},"混凝土的终凝时间",{"key":24,"text":280,"correct":26},"混凝土的初凝时间",{"key":28,"text":282,"correct":22},"终凝加初凝时间",{"key":31,"text":284,"correct":22},"混凝土搅拌时间的两倍",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},926290,"水泥出厂日期超过三个月时，该水泥应如何处理？",[289,291,293,295],{"key":20,"text":290,"correct":22},"不能使用",{"key":24,"text":292,"correct":22},"仍可正常使用",{"key":28,"text":294,"correct":22},"降低等级使用",{"key":31,"text":296,"correct":26},"经试验鉴定后，按试验结果使用",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":31,"analysis":33},926291,"混凝土强度标准值为fcu,k，施工单位的混凝土强度标准差为σ，则混凝土的配制强度为：",[301,303,305,307],{"key":20,"text":302,"correct":22},"0. 95fcu,k",{"key":24,"text":304,"correct":22},"fcu,k",{"key":28,"text":306,"correct":22},"1. 15fcu,k",{"key":31,"text":308,"correct":26},"fcu,k+ 1. 645σ",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":31,"analysis":33},926292,"下列混凝土中哪种不宜采用自落式混凝土搅拌机揽拌？",[313,315,317,319],{"key":20,"text":314,"correct":22},"塑性混凝土",{"key":24,"text":316,"correct":22},"粗集料混凝土",{"key":28,"text":318,"correct":22},"重集料混凝土",{"key":31,"text":320,"correct":26},"干硬性混凝土",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},926293,"在浇筑混凝土时，施工缝应留设在结构受哪种力的最小处？",[325,327,329,331],{"key":20,"text":326,"correct":22},"拉力",{"key":24,"text":328,"correct":22},"压力",{"key":28,"text":330,"correct":26},"剪力",{"key":31,"text":332,"correct":22},"挤压力",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},926294,"混凝土浇筑后12h内应加以覆盖和浇水。使用硅酸盐水泥拌制的混凝土，浇水养护时间不得少于多少天？",[337,338,340,342],{"key":20,"text":25,"correct":22},{"key":24,"text":339,"correct":26},"7",{"key":28,"text":341,"correct":22},"9",{"key":31,"text":343,"correct":22},"14",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},926295,"当室外日平均气温低于多少时，不得采用浇水养护方法养护混凝土？",[348,350,352,354],{"key":20,"text":349,"correct":26},"5°",{"key":24,"text":351,"correct":22},"4°",{"key":28,"text":353,"correct":22},"0°",{"key":31,"text":355,"correct":22},"-5°",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":28,"analysis":33},926296,"为检查结构构件混凝土质量所留的试块，每拌制100盘且不超过多少立方米的同配合比的混凝土，其取样不得少于一次？",[360,362,364,366],{"key":20,"text":361,"correct":22},"50",{"key":24,"text":363,"correct":22},"80",{"key":28,"text":365,"correct":26},"100",{"key":31,"text":367,"correct":22},"150",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":28,"analysis":33},926297,"由普通硅酸盐水泥拌制的混凝土，其临界强度为设计强度的：",[372,374,375,376],{"key":20,"text":373,"correct":22},"20%",{"key":24,"text":195,"correct":22},{"key":28,"text":197,"correct":26},{"key":31,"text":199,"correct":22},{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":28,"analysis":33},926298,"后张法施工时，浇筑构件混凝土的同时先预留孔道，待构件混凝土的强度达到设计强度等级的多少后，方可张拉钢筋？",[381,382,383,384],{"key":20,"text":171,"correct":22},{"key":24,"text":173,"correct":22},{"key":28,"text":175,"correct":26},{"key":31,"text":385,"correct":22},"80%",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":20,"analysis":33},926299,"后张法施工中，单根粗钢筋作预应力筋时，张拉端宜选用哪种锚具？",[390,392,394,396],{"key":20,"text":391,"correct":26},"螺丝端杆锚具",{"key":24,"text":393,"correct":22},"JM-12型锚具",{"key":28,"text":395,"correct":22},"KT-Z型锚具",{"key":31,"text":397,"correct":22},"锥型锚具",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":28,"analysis":33},926300,"后张法施工中，钢丝束做预应力筋时，张拉设备常选用哪种设备？",[402,404,406,408],{"key":20,"text":403,"correct":22},"YC-60穿心式千斤顶",{"key":24,"text":405,"correct":22},"拉杆式千斤顶",{"key":28,"text":407,"correct":26},"锥锚式千斤顶",{"key":31,"text":409,"correct":22},"卷扬机",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":24,"analysis":33},926301,"先张法施工中，待混凝土强度达到设计强度的多少时，方可放松预应力筋？",[414,415,416,417],{"key":20,"text":173,"correct":22},{"key":24,"text":175,"correct":26},{"key":28,"text":385,"correct":22},{"key":31,"text":418,"correct":22},"90%",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},926302,"浇筑混凝土时，其自由下落高度不能超过多少？",[423,425,427,429],{"key":20,"text":424,"correct":22},"1m",{"key":24,"text":426,"correct":26},"2m",{"key":28,"text":428,"correct":22},"5m",{"key":31,"text":430,"correct":22},"4m",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},926303,"关于先张法预应力混凝土施工，下列中哪个规定是正确的？",[435,437,439,441],{"key":20,"text":436,"correct":22},"混凝土强度不得低于C15",{"key":24,"text":438,"correct":26},"混凝土必须一次浇灌完成",{"key":28,"text":440,"correct":22},"混凝土强度达到50%方可放张",{"key":31,"text":442,"correct":22},"不可成组张拉",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},926304,"在滑升模板提升的过程中，将全部荷载传递到浇筑的混凝土结构上是靠什么设备？",[447,449,451,453],{"key":20,"text":448,"correct":22},"提升架",{"key":24,"text":450,"correct":26},"支承杆",{"key":28,"text":452,"correct":22},"千斤顶",{"key":31,"text":454,"correct":22},"操作平台",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},926305,"焊接钢筋网片应采用什么焊接方法？",[459,461,463,465],{"key":20,"text":460,"correct":22},"闪光对焊",{"key":24,"text":462,"correct":26},"点焊",{"key":28,"text":464,"correct":22},"电弧焊",{"key":31,"text":466,"correct":22},"电渣压力焊",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":24,"analysis":33},926306,"钢筋冷拉一般是在什么温度下对钢筋进行强力拉伸，其冷拉控制应力应为什么强度？",[471,473,475,477],{"key":20,"text":472,"correct":22},"低温，超过钢筋的屈服强度",{"key":24,"text":474,"correct":26},"常温，超过钢筋的屈服强度",{"key":28,"text":476,"correct":22},"低温，小于钢筋的屈服强度",{"key":31,"text":478,"correct":22},"常温，小于钢筋的屈服强度",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":20,"analysis":33},926307,"滑升模板是由下列中哪几种系统组成的？",[483,485,487,489],{"key":20,"text":484,"correct":26},"模板系统、操作平台系统和液压系统",{"key":24,"text":486,"correct":22},"模板系统、支撑系统和操作平台系统",{"key":28,"text":488,"correct":22},"模板系统、支撑系统和液压系统",{"key":31,"text":490,"correct":22},"支撑系统、操作平台系统和液压系统",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":31,"analysis":33},926308,"对于悬臂结构构件，底模拆模时要求混凝土强度大于或等于相应混凝土强度标准值的多少？",[495,496,497,499],{"key":20,"text":171,"correct":22},{"key":24,"text":175,"correct":22},{"key":28,"text":498,"correct":22},"85%",{"key":31,"text":177,"correct":26},{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":31,"analysis":33},926309,"为了减少混凝土在栗送时的阻力，一般泵送混凝土最小水泥用量为：",[504,506,508,510],{"key":20,"text":505,"correct":22},"200kg\u002Fm3",{"key":24,"text":507,"correct":22},"250kg\u002Fm3",{"key":28,"text":509,"correct":22},"280kg\u002Fm3",{"key":31,"text":511,"correct":26},"300kg\u002Fm3",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},926310,"预应力筋的张拉程序中，超张拉105%σk的目的是：",[516,518,520,522],{"key":20,"text":517,"correct":22},"提高构件刚度",{"key":24,"text":519,"correct":22},"提高构件抗裂度",{"key":28,"text":521,"correct":22},"减少锚具变形造成的应力损失",{"key":31,"text":523,"correct":26},"减少预应力筋的松弛损失",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":28,"analysis":33},926311,"屋架采用反向扶直时，起重机立于屋架上弦一边，吊钩对位上弦中心，则吊臂与吊钩满足下列关系：",[528,530,532,534],{"key":20,"text":529,"correct":22},"升臂升钩",{"key":24,"text":531,"correct":22},"升臂降钩",{"key":28,"text":533,"correct":26},"降臂升钩",{"key":31,"text":535,"correct":22},"降臂降钩",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},926312,"单层工业厂房牛腿柱吊装临时固定后，需校正下述中哪一项？",[540,542,544,546],{"key":20,"text":541,"correct":22},"平面位置",{"key":24,"text":543,"correct":22},"牛腿顶标高",{"key":28,"text":545,"correct":22},"柱顶标高",{"key":31,"text":547,"correct":26},"垂直度",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":31,"analysis":33},926313,"起重机在厂房内一次开行就安装完一个节间内各种类型的构件，这种吊装方法称为：",[552,554,556,558],{"key":20,"text":553,"correct":22},"旋转法",{"key":24,"text":555,"correct":22},"滑行法",{"key":28,"text":557,"correct":22},"分件吊装法",{"key":31,"text":559,"correct":26},"综合吊装法",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":20,"analysis":33},926314,"采用单机吊装柱子时，用旋转法起吊，应使哪几点共圆？",[564,566,568,570],{"key":20,"text":565,"correct":26},"柱子绑扎点、柱脚中心和杯口中心三点共圆",{"key":24,"text":567,"correct":22},"柱子绑扎点、柱顶中心和杯口中心三点共圆",{"key":28,"text":569,"correct":22},"柱子绑扎点和杯口中心二点共圆",{"key":31,"text":571,"correct":22},"柱子绑扎点和柱脚中心二点共圆",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":20,"analysis":33},926315,"结构构件的吊装过程一般为：",[576,578,580,582],{"key":20,"text":577,"correct":26},"绑扎、起吊、对位、临时固定、校正和最后固定",{"key":24,"text":579,"correct":22},"绑扎、起吊、临时固定、对位、校正和最后固定",{"key":28,"text":581,"correct":22},"绑扎、起吊、对位、校正、临时固定和最后固定",{"key":31,"text":583,"correct":22},"绑扎、起吊、校正、对位、临时固定和最后固定",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":28,"analysis":33},926316,"屋架吊装时，吊索与水平面的夹角不宜小于多少，以免屋架上弦杆受过大的压力？",[588,590,592,594],{"key":20,"text":589,"correct":22},"20°",{"key":24,"text":591,"correct":22},"30°",{"key":28,"text":593,"correct":26},"45°",{"key":31,"text":595,"correct":22},"60°",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":24,"analysis":33},926317,"关于砌砖工程使用的材料，下列哪条是不正确的？",[600,602,604,606],{"key":20,"text":601,"correct":22},"使用砖的品种、强度等级、外观符合设计要求，并有出厂合格证",{"key":24,"text":603,"correct":26},"对强度等级小于M5的水泥混合砂浆，含泥量在15 %以内",{"key":28,"text":605,"correct":22},"石灰膏熟化时间已经超过了15d",{"key":31,"text":607,"correct":22},"水泥的品种与标号符合砌筑砂浆试配单的要求",[609,612,615,618,621,624],{"id":15,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":15},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]