[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-598-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":505},{"id":5,"name":6,"category":7,"favorite":8},598,"(结构) 专业基础考试一级","建筑工程",0,26,50,1746,[13,30,37,44,56,67,75,83,91,103,111,119,127,135,147,157,164,171,183,195,203,215,227,239,247,259,267,279,291,303,313,325,335,347,359,369,377,389,397,405,412,420,428,440,448,456,468,480,487,494],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":29},927329,1,"单选题","图所示的刚架，EI＝常数，各杆长为l，A截面的转角为（ ）。",[19,22,25,27],{"key":20,"text":20,"correct":21},"A",true,{"key":23,"text":23,"correct":24},"B",false,{"key":26,"text":26,"correct":24},"C",{"key":28,"text":28,"correct":24},"D","",{"id":31,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":32,"answer":20,"analysis":29},927330,[33,34,35,36],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":24},{"id":38,"libraryId":5,"type":15,"typeLabel":16,"stem":29,"options":39,"answer":26,"analysis":29},927331,[40,41,42,43],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":21},{"key":28,"text":28,"correct":24},{"id":45,"libraryId":5,"type":15,"typeLabel":16,"stem":46,"options":47,"answer":28,"analysis":29},927332,"在图所示结构中，A截面转角（设顺时针为正）为（ ）。",[48,50,52,54],{"key":20,"text":49,"correct":24},"－5Fa2\u002F（4EI）",{"key":23,"text":51,"correct":24},"－Fa2\u002FEI",{"key":26,"text":53,"correct":24},"2Fa2\u002FEI",{"key":28,"text":55,"correct":21},"5Fa2\u002F（4EI）",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":20,"analysis":29},927333,"如图所示的桁架，EA＝常数， D、E两点的相对水平位移为（ ）。 A、0 B、0.97Fa\u002F（E A）（→←）",[60,62,64,66],{"key":20,"text":61,"correct":21},"4.330Fa\u002F（E",{"key":23,"text":63,"correct":24},"（←→）",{"key":26,"text":65,"correct":24},"5.196Fa\u002F（E",{"key":28,"text":63,"correct":24},{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":26,"analysis":29},927334,"如图所示的结构（EI＝常数）中，D点水平位移（向右为正）为（ ）。",[71,72,73,74],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":21},{"key":28,"text":28,"correct":24},{"id":76,"libraryId":5,"type":15,"typeLabel":16,"stem":77,"options":78,"answer":28,"analysis":29},927335,"如图所示的结构中，B支座发生支座移动，D点水平位移（向右为正）为（ ）。",[79,80,81,82],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":21},{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":26,"analysis":29},927336,"如图所示的刚架，各杆EI相同，C点竖向位移（向下为正）等于（ ）。",[87,88,89,90],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":21},{"key":28,"text":28,"correct":24},{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":26,"analysis":29},927337,"如图所示组合结构，梁式杆件EI＝常数，桁架杆件EA＝常数，C点竖向位移为（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":24},"向上",{"key":23,"text":98,"correct":24},"向下",{"key":26,"text":100,"correct":21},"为零",{"key":28,"text":102,"correct":24},"需计算确定",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":28,"analysis":29},927338,"如图所示，等截面梁的1\u002F3跨度处挠度为（ ）。",[107,108,109,110],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":21},{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":23,"analysis":29},927339,"如图所示的一三铰刚架，其右支座发生了位移，位移的水平分量为Δ1，竖向分量为Δ2，则右半部的转角为（ ）。",[115,116,117,118],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":21},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":24},{"id":120,"libraryId":5,"type":15,"typeLabel":16,"stem":121,"options":122,"answer":23,"analysis":29},927340,"设各杆的EA值相同，在图所示的桁架中，节点C的竖向位移为（ ）。",[123,124,125,126],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":21},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":24},{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":26,"analysis":29},927341,"如图所示结构，支座A发生了位移θA＝α，铰C左、右两侧的相对转角θ为（ ）。",[131,132,133,134],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":21},{"key":28,"text":28,"correct":24},{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":20,"analysis":29},927342,"如图所示，该体系的超静定次数为（ ）。",[139,141,143,145],{"key":20,"text":140,"correct":21},"5",{"key":23,"text":142,"correct":24},"6",{"key":26,"text":144,"correct":24},"7",{"key":28,"text":146,"correct":24},"8",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":23,"analysis":29},927343,"如图所示，该体系的多余联系个数为（ ）。",[151,152,153,155],{"key":20,"text":144,"correct":24},{"key":23,"text":146,"correct":21},{"key":26,"text":154,"correct":24},"10",{"key":28,"text":156,"correct":24},"11",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":29,"options":159,"answer":26,"analysis":29},927344,[160,161,162,163],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":21},{"key":28,"text":28,"correct":24},{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":29,"options":166,"answer":23,"analysis":29},927345,[167,168,169,170],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":21},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":24},{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":20,"analysis":29},927346,"如图所示，桁架a杆的内力是（ ）。",[175,177,179,181],{"key":20,"text":176,"correct":21},"－3F",{"key":23,"text":178,"correct":24},"－2F",{"key":26,"text":180,"correct":24},"2F",{"key":28,"text":182,"correct":24},"3F",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":26,"analysis":29},927347,"如图所示的结构，CF杆的轴力为（ ）。",[187,189,191,193],{"key":20,"text":188,"correct":24},"2P（拉）",{"key":23,"text":190,"correct":24},"P\u002F3（拉）",{"key":26,"text":192,"correct":21},"4P（拉）",{"key":28,"text":194,"correct":24},"4P（压）",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":28,"analysis":29},927348,"图示结构，EI为常数。结点B处弹性支撑刚度系数k=3EI\u002FL3，C点的竖向位移为（ ）。",[199,200,201,202],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":21},{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":20,"analysis":29},927349,"图示平面体系，多余约束的个数是（ ）。",[207,209,211,213],{"key":20,"text":208,"correct":21},"1个",{"key":23,"text":210,"correct":24},"2个",{"key":26,"text":212,"correct":24},"3个",{"key":28,"text":214,"correct":24},"4个",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":26,"analysis":29},927350,"图示结构，A支座提供的约束力矩是（ ）。",[219,221,223,225],{"key":20,"text":220,"correct":24},"60kN·m，下表面受拉",{"key":23,"text":222,"correct":24},"60kN·m，上表面受拉",{"key":26,"text":224,"correct":21},"20kN·m，下表面受拉",{"key":28,"text":226,"correct":24},"20kN·m，上表面受拉",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":26,"analysis":29},927351,"桁架受力如图，下列杆件中，非零杆是（ ）。",[231,233,235,237],{"key":20,"text":232,"correct":24},"杆4-5",{"key":23,"text":234,"correct":24},"杆5-7",{"key":26,"text":236,"correct":21},"杆1-4",{"key":28,"text":238,"correct":24},"杆6-7",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":20,"analysis":29},927352,"图示刚架，EI为常数，忽略轴向变形。当D支座发生支座沉降时，B点转角为（ ）。",[243,244,245,246],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":24},{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":23,"analysis":29},927353,"图所示静定三铰拱，拉杆AB的轴力等于（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":24},"6kN",{"key":23,"text":254,"correct":21},"8kN",{"key":26,"text":256,"correct":24},"10kN",{"key":28,"text":258,"correct":24},"12kN",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":29},927354,"图所示结构，EI=常数，截面高h=常数，线膨胀系数为α，外侧环境温度降低t℃，内侧环境温度升高t℃，引起的C点竖向位移大小为（ ）。",[263,264,265,266],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":24},{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":26,"analysis":29},927355,"下面方法中，不能减小静定结构弯矩的是（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":24},"在简支梁的两端增加伸臂段，使之成为伸臂梁",{"key":23,"text":274,"correct":24},"减小简支梁的跨度",{"key":26,"text":276,"correct":21},"增加简支梁的梁高，从而增大截面惯性矩",{"key":28,"text":278,"correct":24},"对于拱结构，根据荷载特征，选择合理拱轴曲线",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":28,"analysis":29},927356,"图所示体系是几何（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":24},"不变的体系",{"key":23,"text":286,"correct":24},"不变且无多余约束的体系",{"key":26,"text":288,"correct":24},"瞬变的体系",{"key":28,"text":290,"correct":21},"不变，有一个多余约束的体系",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":23,"analysis":29},927357,"图所示梁截面C右截面的弯矩为（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":24},"M／3",{"key":23,"text":298,"correct":21},"M／2",{"key":26,"text":300,"correct":24},"3M／4",{"key":28,"text":302,"correct":24},"3M／2",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":23,"analysis":29},927358,"图所示桁架有几根零杆？（ ）",[307,309,311,312],{"key":20,"text":308,"correct":24},"3",{"key":23,"text":310,"correct":21},"9",{"key":26,"text":140,"correct":24},{"key":28,"text":142,"correct":24},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":26,"analysis":29},927359,"图所示结构为EI常数，若B点水平位移为零，则P1\u002FP2应为（ ）。",[317,319,321,323],{"key":20,"text":318,"correct":24},"10／3",{"key":23,"text":320,"correct":24},"9／2",{"key":26,"text":322,"correct":21},"20／3",{"key":28,"text":324,"correct":24},"17／2",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":23,"analysis":29},927360,"图所示结构各杆温度均升高t℃，且已知EI和EA均为常数，线膨胀系数为α，则点D的竖向位移△Dn为（ ）。",[329,331,333],{"key":20,"text":330,"correct":24},"-αta",{"key":23,"text":332,"correct":21},"αta",{"key":26,"text":334,"correct":24},"2αta",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":26,"analysis":29},927361,"图所示结构两个状态的反力互等定理，和的量纲为（ ）。",[339,341,343,345],{"key":20,"text":340,"correct":24},"力",{"key":23,"text":342,"correct":24},"无量纲",{"key":26,"text":344,"correct":21},"力／长度",{"key":28,"text":346,"correct":24},"长度／力",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":23,"analysis":29},927362,"所示刚架支座A下移量为a，转角为α则B端竖向位移（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":24},"与h、l、El均有关",{"key":23,"text":354,"correct":21},"与h、l有关，与El无关",{"key":26,"text":356,"correct":24},"与l有关，与h、El均无关",{"key":28,"text":358,"correct":24},"与EI有关，与h、l均无关",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":361,"answer":20,"analysis":29},927363,[362,364,365,367],{"key":20,"text":363,"correct":21},"不变，有两个多余约束的体系",{"key":23,"text":286,"correct":24},{"key":26,"text":366,"correct":24},"瞬变体系",{"key":28,"text":368,"correct":24},"有一个多余约束的体系",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":371,"answer":23,"analysis":29},927364,[372,374,375,376],{"key":20,"text":373,"correct":24},"可变的体系",{"key":23,"text":286,"correct":21},{"key":26,"text":288,"correct":24},{"key":28,"text":290,"correct":24},{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":23,"analysis":29},927365,"若荷载作用在静定多跨梁的基本部分上，附属部分上无荷载作用，则（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":24},"基本部分和附属部分均有内力",{"key":23,"text":384,"correct":21},"基本部分有内力，附属部分无内力",{"key":26,"text":386,"correct":24},"基本部分无内力，附属部分有内力",{"key":28,"text":388,"correct":24},"不经计算无法判定",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":29},927366,"图所示结构，各杆，当支座B发生图示的移动时，结点E的水平位移为（ ）。",[393,394,395,396],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":24},{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":29},927367,"图所示结构A、B两点相对水平位移（以离开为正）为（ ）。",[401,402,403,404],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":24},{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":407,"answer":26,"analysis":29},927368,[408,409,410,411],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":21},{"key":28,"text":28,"correct":24},{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":20,"analysis":29},927369,"图所示梁C点竖向位移为（ ）。",[416,417,418,419],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":24},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":23,"analysis":29},927370,"图体系是几何（ ）。",[424,425,426,427],{"key":20,"text":284,"correct":24},{"key":23,"text":286,"correct":21},{"key":26,"text":288,"correct":24},{"key":28,"text":290,"correct":24},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":20,"analysis":29},927371,"在建立虚功方程时，力状态与位移状态的关系是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":21},"彼此独立无关",{"key":23,"text":435,"correct":24},"位移状态必须是由力状态产生的",{"key":26,"text":437,"correct":24},"互为因果关系",{"key":28,"text":439,"correct":24},"力状态必须是由位移状态引起的",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":29},927372,"图所示桁架杆l的轴力为（ ）。",[444,445,446,447],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":21},{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":28,"analysis":29},927373,"图所示结构取图（b）为力法基本体系，El为常数，下列哪项是错误的[A8] ?（ ）",[452,453,454,455],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":21},{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":26,"analysis":29},927374,"图所示刚架中，Μ?c等于（ ）。",[460,462,464,466],{"key":20,"text":461,"correct":24},"2kN·m（右拉）",{"key":23,"text":463,"correct":24},"2kN·m（左拉）",{"key":26,"text":465,"correct":21},"4kN·m（右拉）",{"key":28,"text":467,"correct":24},"6kN·m（左拉）",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":29},927375,"力法的基本未知力是通过变形协调条件确定的，而其余未知量是通过下列哪项条件确定的？（ ）",[472,474,476,478],{"key":20,"text":473,"correct":21},"平衡",{"key":23,"text":475,"correct":24},"物理",{"key":26,"text":477,"correct":24},"图乘",{"key":28,"text":479,"correct":24},"变形协调",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":29,"options":482,"answer":23,"analysis":29},927376,[483,484,485,486],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":21},{"key":26,"text":26,"correct":24},{"key":28,"text":28,"correct":24},{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":29,"options":489,"answer":26,"analysis":29},927377,[490,491,492,493],{"key":20,"text":20,"correct":24},{"key":23,"text":23,"correct":24},{"key":26,"text":26,"correct":21},{"key":28,"text":28,"correct":24},{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":29,"options":496,"answer":26,"analysis":29},927378,[497,499,501,503],{"key":20,"text":498,"correct":24},"0.429，0.571",{"key":23,"text":500,"correct":24},"0.5，0.5",{"key":26,"text":502,"correct":21},"0.571，0.5",{"key":28,"text":504,"correct":24},"0.6，0.4",[506,509,512,515,518,521],{"id":15,"name":507,"category":7,"favorite":508},"领导干部任职前廉政法规知识测试题",92,{"id":510,"name":511,"category":7,"favorite":15},595,"建筑结构与设备",{"id":513,"name":514,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":516,"name":517,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":519,"name":520,"category":7,"favorite":8},534,"BIM工程师",{"id":522,"name":520,"category":7,"favorite":8},535]