[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-598-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},598,"(结构) 专业基础考试一级","建筑工程",0,21,50,1746,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,572,584,596,608],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},927078,1,"单选题","大型综合施工企业宜采用（ ）现场施工管理组织形式。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","部门控制式",false,{"key":24,"text":25,"correct":22},"B","工程队式",{"key":27,"text":28,"correct":29},"C","矩阵式",true,{"key":31,"text":32,"correct":22},"D","混合制式","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},927079,"质量管理需按PDCA循环组织质量管理的全部活动，其中的D是指（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"计划",{"key":24,"text":41,"correct":29},"实施",{"key":27,"text":43,"correct":22},"检查",{"key":31,"text":45,"correct":22},"行动",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},927080,"建设工程项目管理的核心是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":29},"业主方",{"key":24,"text":53,"correct":22},"监理方",{"key":27,"text":55,"correct":22},"分包方",{"key":31,"text":57,"correct":22},"施工方",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},927081,"下列各项不属于施工技术管理制度的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"图纸会审制度",{"key":24,"text":65,"correct":22},"计量管理制度",{"key":27,"text":67,"correct":22},"材料检验制度",{"key":31,"text":69,"correct":29},"质量管理制度",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},927082,"竣工验收的组织者是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":29},"建设单位",{"key":24,"text":77,"correct":22},"设计单位",{"key":27,"text":79,"correct":22},"施工单位",{"key":31,"text":81,"correct":22},"质检单位",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},927083,"当开挖土丘时，宜选用（ ）挖土机。",[86,88,90,92],{"key":20,"text":87,"correct":22},"铲运机",{"key":24,"text":89,"correct":22},"抓铲",{"key":27,"text":91,"correct":29},"正铲",{"key":31,"text":93,"correct":22},"反铲",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},927084,"在要求有抗静电、抗冲击和传爆长度较大洞室爆破时，应采用的方法是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"电力起爆法",{"key":24,"text":101,"correct":22},"脚线起爆法",{"key":27,"text":103,"correct":29},"导爆管起爆法",{"key":31,"text":105,"correct":22},"火花起爆法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},927085,"在空旷场地上大面积打桩时，为减小桩对土体的挤压影响，打桩的顺序应为（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"随意打设",{"key":24,"text":113,"correct":22},"间隔跳打",{"key":27,"text":115,"correct":29},"从中间先打，逐渐向四周推进",{"key":31,"text":117,"correct":22},"从四周向中间打设",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},927086,"采用蛙式打夯机施工时，铺土厚度应为（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":29},"200mm~250mm",{"key":24,"text":125,"correct":22},"250mm~300mm",{"key":27,"text":127,"correct":22},"300mm~350mm",{"key":31,"text":129,"correct":22},"350mm~400mm",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},927087,"泥浆护壁成孔灌注桩施工过程中，如发现排出的泥浆不断出现气泡，说明（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"钻孔倾斜",{"key":24,"text":137,"correct":29},"孔壁坍塌",{"key":27,"text":139,"correct":22},"地下水位变化",{"key":31,"text":141,"correct":22},"钻头损坏",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},927088,"当采用潜水钻成孔灌注桩施工时，孔壁坍塌的主要原因是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"桩间距太小，邻桩在成孔时产生振动和剪力",{"key":24,"text":149,"correct":29},"土质松散，泥浆护壁不好，护筒内水位不够高",{"key":27,"text":151,"correct":22},"钻杆不垂直或者碰到孤石",{"key":31,"text":153,"correct":22},"钻孔时遇到有倾斜度的较硬土层交界处或岩石倾斜处，钻头所受阻力不均匀",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},927089,"影响新浇混凝土侧压力的主要因素是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"骨料种类",{"key":24,"text":161,"correct":22},"水泥用量",{"key":27,"text":163,"correct":22},"模板类型",{"key":31,"text":165,"correct":29},"混凝土的浇筑速度",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},927090,"网络计划的优化是通过利用（ ）来不断改善网络计划的最初方案，在满足既定的条件下以达到最优方案。",[170,172,174,176],{"key":20,"text":171,"correct":29},"时差",{"key":24,"text":173,"correct":22},"持续时间",{"key":27,"text":175,"correct":22},"间隔时间",{"key":31,"text":177,"correct":22},"工期",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},927091,"砌体工程中，下列墙体或部位中可以留设脚手眼的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"120mm厚砖墙、空斗墙和砖柱",{"key":24,"text":185,"correct":29},"宽度小于2m，但大于1m的窗间墙",{"key":27,"text":187,"correct":22},"门洞窗口两侧200mm和距转角450mm的范围内",{"key":31,"text":189,"correct":22},"梁和梁垫下及其左右500mm范围内",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},927092,"以整个建设项目或建筑群为编制对象，用以指导其施工全过程各项施工活动的综合技术经济文件为（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"分部工程施工组织设计",{"key":24,"text":197,"correct":22},"分项工程施工组织设计",{"key":27,"text":199,"correct":22},"单位工程施工组织设计",{"key":31,"text":201,"correct":29},"施工组织总设计",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},927093,"进行资源有限—工期最短优化时，当将某工作移出超过限量的资源时段后，计算发现工期增量小于零，以下说明正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"总工期会延长",{"key":24,"text":209,"correct":22},"总工期会缩短",{"key":27,"text":211,"correct":22},"总工期不变",{"key":31,"text":213,"correct":29},"这种情况不会出现",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},927094,"钢筋经冷拉后不得用作构件的（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"箍筋",{"key":24,"text":221,"correct":22},"预应力钢筋",{"key":27,"text":223,"correct":29},"吊环",{"key":31,"text":225,"correct":22},"主筋",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},927095,"某基坑深度大、土质差、地下水位高，其土壁支护宜采用（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"放坡开挖",{"key":24,"text":233,"correct":22},"H型钢桩",{"key":27,"text":235,"correct":22},"水泥土搅拌桩",{"key":31,"text":237,"correct":29},"地下连续墙",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},927096,"在建筑物稠密且为淤泥质土的基坑支护结构中，其支撑结构宜选用（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":29},"自产式（悬壁式）",{"key":24,"text":245,"correct":22},"锚拉式",{"key":27,"text":247,"correct":22},"土层锚杆",{"key":31,"text":249,"correct":22},"钢结构水平支撑",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},927097,"某方土工程总挖方量为1万m3。预算单价45元\u002Fm3，该工程总预算为45万，计划用25天完成，每天400m3。开工后第7天早晨刚上班时，经业主复核的挖土量为2000m3，承包商实际付出累计12万元。应用挣值法（赢得值法）对项目进展进行评估，下列哪项评估结论不正确？（ ）",[254,256,258,260],{"key":20,"text":255,"correct":22},"进度偏差=-1.8万元，因此工期拖延",{"key":24,"text":257,"correct":29},"进度偏差=1.8万元，因此工期超前",{"key":27,"text":259,"correct":22},"费用偏差=-3万元，因此费用超支",{"key":31,"text":261,"correct":22},"工期拖后1天",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},927098,"压实松土时，应采用（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":29},"先用轻碾后用重碾",{"key":24,"text":269,"correct":22},"先震动碾压后停振碾压",{"key":27,"text":271,"correct":22},"先压中间再压边缘",{"key":31,"text":273,"correct":22},"先快速后慢速",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},927099,"屋架采用反向扶直时，起重机立于屋架上弦一边，吊钩对位上弦中心，则臂与吊钩满足下列关系（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"升臂升钩",{"key":24,"text":281,"correct":22},"升臂降钩",{"key":27,"text":283,"correct":29},"降臂升钩",{"key":31,"text":285,"correct":22},"降臂降钩",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},927100,"单代号网络图中，某工作量最早完成时间与其紧后工作的最早开始时间之差为（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"总时差",{"key":24,"text":293,"correct":29},"自由时差",{"key":27,"text":295,"correct":22},"虚工作",{"key":31,"text":297,"correct":22},"时间间隔",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},927101,"浇筑混凝土单向板时，施工缝应留置在（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"中间1\u002F3跨度范围内且平行于板的长边",{"key":24,"text":305,"correct":22},"平行于板的长边任何位置",{"key":27,"text":307,"correct":29},"平行于板的短边任何位置",{"key":31,"text":309,"correct":22},"中间1\u002F3跨度范围内",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},927102,"在网络计划中，若某工序的总时差为5d，局部时差（自由时差）为3d，则在不影响后续工作最早开始时间的前提下，该工序所具有的最大机动时间为（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"2d",{"key":24,"text":317,"correct":29},"3d",{"key":27,"text":319,"correct":22},"5d",{"key":31,"text":321,"correct":22},"8d",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},927103,"钢筋绑扎接头时，受压钢筋绑扎接头搭接长度是受拉钢筋绑扎接头搭接长度的（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"0.5倍",{"key":24,"text":329,"correct":29},"0.7倍",{"key":27,"text":331,"correct":22},"1倍",{"key":31,"text":333,"correct":22},"1.2倍",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},927104,"混凝土运输、浇筑及间歇的全部时间不允许超过（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":29},"混凝土的初凝时间",{"key":24,"text":341,"correct":22},"混凝土的终凝时间",{"key":27,"text":343,"correct":22},"终凝时间加初凝时间",{"key":31,"text":345,"correct":22},"混凝土的搅拌时间",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},927105,"浇筑配筋较密的钢筋混凝土剪力墙结构时，最好选用的振捣设备是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"内部振动器",{"key":24,"text":353,"correct":22},"表面振动器",{"key":27,"text":355,"correct":29},"外部振动器",{"key":31,"text":357,"correct":22},"人工振捣",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},927106,"砖砌体的砌筑时应做到“横平竖直、砂浆饱满、组砌得当、接搓可靠”。那么水平灰缝砂浆饱满度应不小于（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":29},"80％",{"key":24,"text":365,"correct":22},"85％",{"key":27,"text":367,"correct":22},"90％",{"key":31,"text":369,"correct":22},"95％",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},927107,"混凝土搅拌时间的确定与下列哪几项有关?（ ） ①混凝土的和易性；②搅拌机的型号；③用水量的多少；④骨料的品种。",[374,376,378,380],{"key":20,"text":375,"correct":29},"①②④",{"key":24,"text":377,"correct":22},"②④",{"key":27,"text":379,"correct":22},"①②③",{"key":31,"text":381,"correct":22},"①③④",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},927108,"施工平面图设计时，首先要考虑的是（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":29},"确定垂直运输机械的位置",{"key":24,"text":389,"correct":22},"布置运输道路",{"key":27,"text":391,"correct":22},"布置生产、生活用的临时设置",{"key":31,"text":393,"correct":22},"布置搅拌站、材料堆场的位置",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},927109,"砖砌工程中，设计要求的洞口尺寸超过（ ）mm时，应设置过梁或砌筑平拱。",[398,400,402,404],{"key":20,"text":399,"correct":29},"300",{"key":24,"text":401,"correct":22},"400",{"key":27,"text":403,"correct":22},"500",{"key":31,"text":405,"correct":22},"600",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},927110,"图所示直径为d=22mm的钢筋的下料长度为（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"8304",{"key":24,"text":413,"correct":22},"8348",{"key":27,"text":415,"correct":29},"8392",{"key":31,"text":417,"correct":22},"8432",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},927111,"某工程在评定混凝土强度质量时，其中两组试块的试件强度分别为；28.0、32.2、33.1和28.1、33.5、34.7，则这两试块的强度代表值为（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"32.2；33.5",{"key":24,"text":425,"correct":22},"31.1；34.1",{"key":27,"text":427,"correct":22},"31.1；32.1",{"key":31,"text":429,"correct":29},"31.1；33.5",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},927112,"土方填筑压实正确的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"夯实法适于大面积填土工程",{"key":24,"text":437,"correct":22},"碾压法适用于基坑回填",{"key":27,"text":439,"correct":29},"振动压实法用于将非粘性土压实",{"key":31,"text":441,"correct":22},"有机质大于6%的土仅用于无压实要求的土",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},927113,"在有关流水施工的概念中，下列正确的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"对于非节奏专业流水施工，工作队在相邻施工段上的施工，可以间断",{"key":24,"text":449,"correct":22},"节奏专业流水的垂直进度图表中，各个施工相邻过程的施工进度线是相互平行的",{"key":27,"text":451,"correct":22},"在组织搭接施工时，应先计算相邻施工过程的流水步距",{"key":31,"text":453,"correct":29},"对于非节奏专业流水施工，各施工段上允许出现暂时没有工作队投入施工的现象",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},927114,"影响冷拔低碳钢丝质量的主要因素是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"原材料的质量",{"key":24,"text":461,"correct":22},"冷拔的次数",{"key":27,"text":463,"correct":22},"冷拔总压缩率",{"key":31,"text":465,"correct":29},"A和C",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},927115,"关于梁模板拆除的一般顺序，下面描述正确的是（ ）。 Ⅰ.先支的先拆，后支的后拆 Ⅱ.先支的后拆，后知的先拆 Ⅲ.先拆除承重部分，后拆除非承重部分 Ⅳ.先拆除非承重部分，后拆除承重部分",[470,472,474,476],{"key":20,"text":471,"correct":22},"Ⅰ、Ⅲ",{"key":24,"text":473,"correct":29},"Ⅱ、Ⅳ",{"key":27,"text":475,"correct":22},"Ⅰ、Ⅳ",{"key":31,"text":477,"correct":22},"Ⅱ、Ⅲ",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},927116,"在进行钢筋混凝土框架结构的施工过程中，对混凝土集料的最大粒径的要求，下面正确的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"不超过结构最小截面的1／4，钢筋间最小净距的1／2",{"key":24,"text":485,"correct":29},"不超过结构最小截面的1／4，钢筋间最小净距的3／4",{"key":27,"text":487,"correct":22},"不超过结构最小截面的1／2，钢筋间最小净距的1／2",{"key":31,"text":489,"correct":22},"不超过结构最小截面的1／2，钢筋间最小净距的3／4",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},927117,"对工程网络进行“资源有限，工期最短”的优化的主要目的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"尽可能缩短工期，满足资源限量",{"key":24,"text":497,"correct":29},"延长工期最短，满足资源限量",{"key":27,"text":499,"correct":22},"尽可能缩短工期，使得资源消耗量最低",{"key":31,"text":501,"correct":22},"延长工期最短，使得资源消耗量最低",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":24,"analysis":33},927118,"桩数为4~16根桩基中的桩，其打桩的桩位允许偏差为：",[506,508,510,512],{"key":20,"text":507,"correct":22},"100mm",{"key":24,"text":509,"correct":29},"1\u002F2桩径或边长",{"key":27,"text":511,"correct":22},"150mm",{"key":31,"text":513,"correct":22},"1\u002F3桩径或边长",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},927119,"当基坑降水深度超过8m时，比较经济的降水方法是：",[518,520,522,524],{"key":20,"text":519,"correct":22},"轻型井点",{"key":24,"text":521,"correct":29},"喷射井点",{"key":27,"text":523,"correct":22},"管井井点",{"key":31,"text":525,"correct":22},"明沟排水法",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},927120,"流水施工中，流水节拍是指下述中的哪一种？",[530,532,534,536],{"key":20,"text":531,"correct":22},"—个施工过程在各个施工段上的总持续时间",{"key":24,"text":533,"correct":29},"—个施工过程在一个施工段上的持续工作时间",{"key":27,"text":535,"correct":22},"两个相邻施工过程先后进入流水施工段的时间间隔",{"key":31,"text":537,"correct":22},"流水施工的工期",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},927121,"全面质量管理要求哪个范围的人员参加质量管理？",[542,544,546,548],{"key":20,"text":543,"correct":22},"所有部门负责人",{"key":24,"text":545,"correct":22},"生产部门的全体人员",{"key":27,"text":547,"correct":22},"相关部门的全体人员",{"key":31,"text":549,"correct":29},"企业所有部门和全体人员",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":31,"analysis":33},927122,"某工程按下表要求组织流水施工，相应流水步距KⅠ-Ⅱ及KⅡ-Ⅲ分别应为多少天？",[554,556,558,560],{"key":20,"text":555,"correct":22},"2,2",{"key":24,"text":557,"correct":22},"2,3",{"key":27,"text":559,"correct":22},"3,3",{"key":31,"text":561,"correct":29},"5,2",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":24,"analysis":33},927123,"某工程双代号网络图如图所示，工作①→③的局部时差应为：",[566,568,569,570],{"key":20,"text":567,"correct":22},"1d",{"key":24,"text":315,"correct":29},{"key":27,"text":317,"correct":22},{"key":31,"text":571,"correct":22},"4d",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":20,"analysis":33},927124,"某均布荷载作用下的钢筋混凝土矩形截面简支梁，截面尺寸为b×h=200mm×500mm，",[576,578,580,582],{"key":20,"text":577,"correct":29},"186kN",{"key":24,"text":579,"correct":22},"223kN",{"key":27,"text":581,"correct":22},"102.3kN",{"key":31,"text":583,"correct":22},"71.6kN",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":31,"analysis":33},927125,"混凝土强度等级C30表示（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"混凝土的立方体受压强度设计值为30MPa",{"key":24,"text":591,"correct":22},"混凝土的棱柱体受压强度标准值为30MPa",{"key":27,"text":593,"correct":22},"混凝土的立方体受压强度设计值不小于30MPa，但未达35MPa",{"key":31,"text":595,"correct":29},"混凝土的立方体受压强度标准值不小于30MPa，但未达35MPa",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":24,"analysis":33},927126,"对于一个钢筋混凝土大偏心受压短柱，当作用的弯矩给定时，轴向受压荷载的增加对它的安全状态产生的影响是（ ）。",[600,602,604,606],{"key":20,"text":601,"correct":22},"趋于安全",{"key":24,"text":603,"correct":29},"趋于不安全",{"key":27,"text":605,"correct":22},"保持不变",{"key":31,"text":607,"correct":22},"影响规律不确定",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":20,"analysis":33},927127,"钢筋混凝土单筋受弯构件，在正截面受弯承载力计算中，适筋截面与超筋截面的特征表现在（ ）。",[612,613,614,615],{"key":20,"text":20,"correct":29},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]