[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-598-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},598,"(结构) 专业基础考试一级","建筑工程",0,20,50,1746,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,188,200,212,224,236,248,260,272,284,294,306,318,330,342,353,365,377,389,401,413,425,437,449,461,473,485,495,505,517,529,541,551,560,569,581,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},927028,1,"单选题","不宜采用集水井降水法来降低地下水位的地基土的土质为（ ）",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","粉质黏土",false,{"key":24,"text":25,"correct":22},"B","黏土",{"key":27,"text":28,"correct":29},"C","粉砂",true,{"key":31,"text":32,"correct":22},"D","人工填土","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},927029,"反铲挖土机的挖土特点是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"后退向下，强制切土",{"key":24,"text":41,"correct":22},"前进向上，强制切土",{"key":27,"text":43,"correct":22},"后退向上，强制切土",{"key":31,"text":45,"correct":22},"前进向下，强制切土",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},927030,"有一土方工程须挖土8000m3。现有反铲挖土机，生产率为400m3\u002F台班，工期7d，每天工作两班，时间利用系数K=0.8，完成该项工作需（ ）台反铲挖土机。",[50,52,54,56],{"key":20,"text":51,"correct":22},"1",{"key":24,"text":53,"correct":29},"2",{"key":27,"text":55,"correct":22},"3",{"key":31,"text":57,"correct":22},"4",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},927031,"关于打桩的入土深度控制，承受轴向荷载的摩擦桩应该（ ）",[62,64,66,68],{"key":20,"text":63,"correct":22},"以贯入度为主，以标高作为参考",{"key":24,"text":65,"correct":22},"只控制贯入度不控制标高",{"key":27,"text":67,"correct":29},"以标高为主，以贯入度作为参考",{"key":31,"text":69,"correct":22},"只控制标高不控制贯入度",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},927032,"打入法进行预制桩施工，为了取得良好的效果，宜采用（ ）的打桩方式。",[74,76,78,80],{"key":20,"text":75,"correct":29},"重锤低击，低提重打",{"key":24,"text":77,"correct":22},"轻锤高击，高提重打",{"key":27,"text":79,"correct":22},"轻锤低击，低提轻打",{"key":31,"text":81,"correct":22},"重锤高击，高提重打",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},927033,"按照施工方法的不同，桩基础可以分为（ ）。 ①灌注桩；②摩擦桩；③钢管桩；④预制桩；⑤端承桩。",[86,88,90,92],{"key":20,"text":87,"correct":29},"①④",{"key":24,"text":89,"correct":22},"②⑤",{"key":27,"text":91,"correct":22},"①③⑤",{"key":31,"text":93,"correct":22},"③④",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},927034,"泥浆护壁成孔过程中，泥浆的作用除了保护孔壁、防止塌孔外，还有（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"提高钻进速度",{"key":24,"text":101,"correct":29},"排出土渣",{"key":27,"text":103,"correct":22},"遇硬土层易钻进",{"key":31,"text":105,"correct":22},"保护钻机设备",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},927035,"当沟槽开挖在5m以上时，对松散和湿度很高的土进行土壁支撑，应采用的支撑为（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":29},"垂直挡土板式支撑",{"key":24,"text":113,"correct":22},"断续或连续式水平挡土板支撑",{"key":27,"text":115,"correct":22},"连续式水平挡土板支撑",{"key":31,"text":117,"correct":22},"断续式水平挡土板支撑",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},927036,"适用于碎石土、砂土、黏性土、湿陷性黄土及人工填土等地基加固处理的方法是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":29},"强夯法",{"key":24,"text":125,"correct":22},"预压法",{"key":27,"text":127,"correct":22},"旋喷法",{"key":31,"text":129,"correct":22},"振冲法",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},927037,"轻型井点的平面尺寸为16m×20m，其假想半径为（ ）m。",[134,136,138,140],{"key":20,"text":135,"correct":22},"20",{"key":24,"text":137,"correct":22},"15",{"key":27,"text":139,"correct":29},"10",{"key":31,"text":141,"correct":22},"5",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},927038,"钢筋冷拉一般是______下对钢筋进行强力拉伸，其冷拉控制应力应______。（ ）",[146,148,150,152],{"key":20,"text":147,"correct":22},"低温；超过钢筋的屈服强度",{"key":24,"text":149,"correct":29},"常温；超过钢筋的屈服强度",{"key":27,"text":151,"correct":22},"低温；小于钢筋的屈服强度",{"key":31,"text":153,"correct":22},"常温；小于钢筋的屈服强度",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},927039,"关于钢筋代换，下列说法不正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"不同种类钢筋代换，应按钢筋受拉承载力设计值相等的原则进行",{"key":24,"text":161,"correct":22},"梁的纵向受力钢筋与弯起钢筋应分别进行",{"key":27,"text":163,"correct":22},"同钢号钢筋之间的代换，按代换前后面积相等的原则进行",{"key":31,"text":165,"correct":29},"对于有抗震要求的框架，可以用强度等级高的钢筋代替设计中的钢筋",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},927040,"制作预埋件时，钢筋与钢板联接采用的方法为（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"闪光对焊",{"key":24,"text":173,"correct":29},"电弧焊",{"key":27,"text":175,"correct":22},"电阻点焊",{"key":31,"text":177,"correct":22},"电渣压力焊",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},927041,"滑升模板由下列哪项组成？（ ） ①模板系统；②操作平台系统；③提升系统；④液压系统；⑤控制系统。",[182,184,185,187],{"key":20,"text":183,"correct":29},"①②③",{"key":24,"text":87,"correct":22},{"key":27,"text":186,"correct":22},"③④⑤",{"key":31,"text":89,"correct":22},{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":31,"analysis":33},927042,"滑升模板安装呈上口小、下口大的锥形，结构断面厚度以模板上口以下（ ）模板高度处的净间距为准。",[192,194,196,198],{"key":20,"text":193,"correct":22},"1\u002F3",{"key":24,"text":195,"correct":22},"2\u002F5",{"key":27,"text":197,"correct":22},"1\u002F2",{"key":31,"text":199,"correct":29},"2\u002F3",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},927043,"板和支架设计计算中，对梁底模板进行承载能力计算时，其计算荷载组合应为（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":22},"模板及支架自重、新浇筑混凝土自重、钢筋质量、倾倒混凝土时产生的荷载",{"key":24,"text":207,"correct":29},"模板及支架自重、新浇筑混凝土质量、钢筋质量、振捣混凝土时产生的荷载",{"key":27,"text":209,"correct":22},"新浇筑混凝土侧压力、振捣混凝土时产生的荷载",{"key":31,"text":211,"correct":22},"模板及支架自重、新浇筑混凝土质量、钢筋质量、施工人员和浇筑设备、混凝土堆积料质量",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},927044,"检验混凝土强度和受力钢筋位置是否符合设计要求，应优先选择（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"预留试块法",{"key":24,"text":219,"correct":29},"非破损检验法",{"key":27,"text":221,"correct":22},"后桩拔出法",{"key":31,"text":223,"correct":22},"钻芯法",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},927045,"施工现场，混凝土是按（ ）配制的。",[228,230,232,234],{"key":20,"text":229,"correct":29},"混凝土的施工配合比",{"key":24,"text":231,"correct":22},"混凝土强度标准值的配合比",{"key":27,"text":233,"correct":22},"混凝土的设计配合比",{"key":31,"text":235,"correct":22},"混凝土抗拉强度的配合比施工时混凝土的",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},927046,"钢筋混凝土框架结构施工过程中，混凝土的梁和板应同时浇筑。当梁高超过多少时，为了施工方便，也可以将梁单独浇筑？（ ）",[240,242,244,246],{"key":20,"text":241,"correct":22},"0.8",{"key":24,"text":243,"correct":29},"1.0",{"key":27,"text":245,"correct":22},"1.2",{"key":31,"text":247,"correct":22},"1.4",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":31,"analysis":33},927047,"混凝土强度不够的原因是多方面的，下列各项不属于主要原因的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"原材料不合格",{"key":24,"text":255,"correct":22},"配合比不准",{"key":27,"text":257,"correct":22},"振捣不实",{"key":31,"text":259,"correct":29},"冬期施工",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},927048,"浇筑大体积混凝土时，采取措施不当的是（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"宜选用水化热较低的水泥",{"key":24,"text":267,"correct":29},"扩大混凝土的散热面，尽量减少覆盖和保温",{"key":27,"text":269,"correct":22},"掺缓凝型减水剂",{"key":31,"text":271,"correct":22},"采用中粗砂和大粒径、级配良好的石子",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":31,"analysis":33},927049,"在大体积混凝土施工中，不宜选用（ ）水泥。",[276,278,280,282],{"key":20,"text":277,"correct":22},"矿渣",{"key":24,"text":279,"correct":22},"火山灰",{"key":27,"text":281,"correct":22},"粉煤灰",{"key":31,"text":283,"correct":29},"硅酸盐",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":27,"analysis":33},927050,"大体积混凝土浇筑后，一般控制混凝土内外温差不宜超过（ ）℃。",[288,289,290,292],{"key":20,"text":141,"correct":22},{"key":24,"text":137,"correct":22},{"key":27,"text":291,"correct":29},"25",{"key":31,"text":293,"correct":22},"35",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},927051,"当有主次梁楼盖的混凝土不能连续浇筑时，施工缝应留在（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"主梁跨中1\u002F3范围内",{"key":24,"text":301,"correct":29},"次梁跨中1\u002F3范围内",{"key":27,"text":303,"correct":22},"主梁跨边1\u002F3范围内",{"key":31,"text":305,"correct":22},"次梁跨边1\u002F3范围内",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},927052,"在施工缝处继续浇筑混凝土时，应待已浇筑的混凝土强度不低于（ ）时才允许继续浇筑。",[310,312,314,316],{"key":20,"text":311,"correct":29},"1.2N\u002Fmm2",{"key":24,"text":313,"correct":22},"2.0N\u002Fmm2",{"key":27,"text":315,"correct":22},"75%的强度标准值",{"key":31,"text":317,"correct":22},"90%的强度标准值",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":27,"analysis":33},927053,"为保证施工质量，后张法工艺中孔道留设施工应（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"在混凝土浇筑后尽快抽管",{"key":24,"text":325,"correct":22},"初凝前抽管",{"key":27,"text":327,"correct":29},"初凝后、终凝前抽管",{"key":31,"text":329,"correct":22},"尽量不抽管",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},927054,"采用单机吊装柱子，用旋转法起吊时，柱子绑扎点、柱脚中心和杯口中心三者的关系应该是（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":29},"柱子绑扎点、柱脚中心和杯口中心三点共圆",{"key":24,"text":337,"correct":22},"柱子绑扎点、柱顶中心和杯口中心三点共圆",{"key":27,"text":339,"correct":22},"柱子绑扎点和杯口中心二点共圆",{"key":31,"text":341,"correct":22},"柱子绑扎点和柱脚中心二点共圆",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":20,"analysis":33},927055,"钢筋混凝土柱，按柱的起重量确定的最大起重半径为8m，按柱的起重高度确定的最大起重半径为10m，吊装该柱的最大起重半径为（ ）m。",[346,348,350,351],{"key":20,"text":347,"correct":29},"8",{"key":24,"text":349,"correct":22},"9",{"key":27,"text":139,"correct":22},{"key":31,"text":352,"correct":22},"18",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":31,"analysis":33},927056,"建造18层塔楼，施工时宜选用的垂直运输机械为（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":22},"爬升式塔式起重机",{"key":24,"text":360,"correct":22},"汽车式起重机",{"key":27,"text":362,"correct":22},"履带式起重机",{"key":31,"text":364,"correct":29},"自升式塔式起重机",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":27,"analysis":33},927057,"当柱平卧起吊的抗弯能力不足时，吊装前需先将柱翻身后再绑扎起吊，此时应采用的绑扎方法是（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"旋转绑扎法",{"key":24,"text":372,"correct":22},"两点绑扎法",{"key":27,"text":374,"correct":29},"直吊绑扎法",{"key":31,"text":376,"correct":22},"斜吊绑扎法",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":27,"analysis":33},927058,"对覆带式起重机各技术参数间的关系，以下描述中错误的是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"当起重臂仰角不变时，则起重臂长度增加，则起重半径和起重高度增加，而起重量减小",{"key":24,"text":384,"correct":22},"当起重臂长度一定时，随着仰角的增加，起重量和起重高度增加，而起重半径减小",{"key":27,"text":386,"correct":29},"当起重臂长度增加时，起重量和起重半径增加",{"key":31,"text":388,"correct":22},"当起重半径增大时，起重高度随之减小",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},927059,"为提高砖与砂浆间的粘结力和砖砌体的抗剪强度，可采取的技术措施是（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":22},"采用水泥砂浆",{"key":24,"text":396,"correct":22},"掺入有机塑化剂",{"key":27,"text":398,"correct":22},"增加砂浆中的水泥用量",{"key":31,"text":400,"correct":29},"砖砌筑前浇水湿润",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},927060,"砖砌体的外墙转角处留槎要求是（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"留直槎",{"key":24,"text":408,"correct":29},"留斜槎",{"key":27,"text":410,"correct":22},"留直槎或斜槎",{"key":31,"text":412,"correct":22},"留直槎加密拉结筋",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},927061,"砖石工程冬期施工时，所采用的砂浆宜为（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"水泥砂浆",{"key":24,"text":420,"correct":29},"掺盐砂浆",{"key":27,"text":422,"correct":22},"石灰砂浆",{"key":31,"text":424,"correct":22},"粘土砂浆",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},927062,"单位工程施工组织设计的核心内容是（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"确定施工进度计划",{"key":24,"text":432,"correct":29},"选择施工方案",{"key":27,"text":434,"correct":22},"设计施工现场平面布置图",{"key":31,"text":436,"correct":22},"确定施工准备工作计划",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":24,"analysis":33},927063,"下列关于施工组织总设计的描述，不正确的是（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":22},"施工组织总设计是在初步设计和扩大初步设计批准后进行编制的",{"key":24,"text":444,"correct":29},"施工组织总设计是由总承包单位的总工程师负责编制的",{"key":27,"text":446,"correct":22},"施工组织总设计是施工单位编制施工计划和单位工程施工组织设计的依据",{"key":31,"text":448,"correct":22},"施工组织总设计是指导施工全过程各项活动的技术、经济的综合性文件",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},927064,"在单位工程施工中，对于技术复杂或结构特别重要的分部分项工程，需要根据实际情况编制（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"施工组织条件设计",{"key":24,"text":456,"correct":29},"分部分项工程施工设计",{"key":27,"text":458,"correct":22},"单项工程施工设计",{"key":31,"text":460,"correct":22},"单位工程施工设计",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":27,"analysis":33},927065,"在确定施工过程的先后顺序时，应考虑（ ）。 （1）施工工艺的要求；（2）施工人员的素质；（3）安全技术的要求；（4）施工质量的要求；（5）施工组织的要求；（6）施工成本的要求。",[465,467,469,471],{"key":20,"text":466,"correct":22},"（1）（2）（3）（4）（5）",{"key":24,"text":468,"correct":22},"（1）（2）（3）（4）（6）",{"key":27,"text":470,"correct":29},"（1）（3）（4）（5）",{"key":31,"text":472,"correct":22},"（1）（3）（4）（5）（6）",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},927066,"在设计施工平面图时，首先应（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"布置运输道路",{"key":24,"text":480,"correct":29},"确定垂直运输机械的位置",{"key":27,"text":482,"correct":22},"布置生产、生活用临时设置",{"key":31,"text":484,"correct":22},"布置搅拌站、材料堆场的位置",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":20,"analysis":33},927067,"外墙抹灰的产量定额为4m2\u002F工日，则相应的时间定额为（ ）工日\u002Fm2。",[489,491,493,494],{"key":20,"text":490,"correct":29},"0.25",{"key":24,"text":492,"correct":22},"0.5",{"key":27,"text":51,"correct":22},{"key":31,"text":53,"correct":22},{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":20,"analysis":33},927068,"对整个建设项目的施工进行通盘规划，带有全局性的技术经济文件是（ ）。",[499,501,502,503],{"key":20,"text":500,"correct":29},"施工组织总设计",{"key":24,"text":454,"correct":22},{"key":27,"text":460,"correct":22},{"key":31,"text":504,"correct":22},"分部工程施工设计",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":31,"analysis":33},927069,"某项工作有两项紧后工作D和 E，D的最迟完成时间为20d，持续时间为13d；E最迟完成时间为15d，持续时间为10d。则本工作的最迟完成为（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":22},"20d",{"key":24,"text":512,"correct":22},"15d",{"key":27,"text":514,"correct":22},"10d",{"key":31,"text":516,"correct":29},"5d",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":27,"analysis":33},927070,"为保证各施工队都能连续工作，且各施工段上都连续地有施工队在工作，施工段数应（ ）。",[521,523,525,527],{"key":20,"text":522,"correct":22},"等于流水步距",{"key":24,"text":524,"correct":22},"等于施工过程数",{"key":27,"text":526,"correct":29},"大于施工过程数",{"key":31,"text":528,"correct":22},"小于施工过程数",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":27,"analysis":33},927071,"在固定节拍专业流水中，为缩短工期，两个相邻的施工过程应当（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":22},"保持一定间距",{"key":24,"text":536,"correct":22},"保持固定间距",{"key":27,"text":538,"correct":29},"尽量靠近",{"key":31,"text":540,"correct":22},"保证连续性",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":31,"analysis":33},927072,"某二层楼进行固定节拍专业流水施工，每层施工段数为3，施工过程有3个，流水节拍为2d，流水工期为（ ）d。",[545,546,547,549],{"key":20,"text":347,"correct":22},{"key":24,"text":139,"correct":22},{"key":27,"text":548,"correct":22},"12",{"key":31,"text":550,"correct":29},"16",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},927073,"某现浇钢筋混凝土工程由支模板、绑钢筋和浇混凝土三个分项工程组成，其流水节拍分别为支模板6d、绑钢筋4d和浇混凝土2d。组织成倍节拍流水施工的流水步距为（ ）d。",[555,556,557,559],{"key":20,"text":53,"correct":29},{"key":24,"text":57,"correct":22},{"key":27,"text":558,"correct":22},"6",{"key":31,"text":347,"correct":22},{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":27,"analysis":33},927074,"某流水施工组织成加快加倍节拍流水，施工段数为6，甲、乙、丙三个施工过程的流水节拍分别为6、4和2d，其流水工期为（ ）d。",[564,565,566,568],{"key":20,"text":558,"correct":22},{"key":24,"text":139,"correct":22},{"key":27,"text":567,"correct":29},"22",{"key":31,"text":550,"correct":22},{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":27,"analysis":33},927075,"双代号网络图的三要素是（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"时差、最早时间和最迟时间",{"key":24,"text":576,"correct":22},"总时差、局部时差和计算工期",{"key":27,"text":578,"correct":29},"工作、事件和线路",{"key":31,"text":580,"correct":22},"工作、事件和关键线路",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":24,"analysis":33},927076,"图为某工程双代号网络图，工作①—③的局部时差为（ ）天。",[585,586,587,588],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":29},{"key":27,"text":55,"correct":22},{"key":31,"text":57,"correct":22},{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":31,"analysis":33},927077,"下列参数属于双代号网络计划时间参数的是（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":22},"STSi-j",{"key":24,"text":596,"correct":22},"ESi",{"key":27,"text":598,"correct":22},"LFi",{"key":31,"text":600,"correct":29},"ESi-j",[602,605,608,611,614,617],{"id":15,"name":603,"category":7,"favorite":604},"领导干部任职前廉政法规知识测试题",92,{"id":606,"name":607,"category":7,"favorite":15},595,"建筑结构与设备",{"id":609,"name":610,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":612,"name":613,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":615,"name":616,"category":7,"favorite":8},534,"BIM工程师",{"id":618,"name":616,"category":7,"favorite":8},535]