[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-927758":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},927758,598,1,"单选题","冬期露天施工的混凝土工程不宜选用（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","粉煤灰水泥",true,{"key":16,"text":17,"correct":18},"B","硅酸盐水泥",false,{"key":20,"text":21,"correct":18},"C","普通硅酸盐水泥",{"key":23,"text":24,"correct":18},"D","高铝水泥","冬期施工的混凝土工程要求水泥水化热大，早期强度高，而粉煤灰水泥的水化热低，故其不宜用于冬季施工。",{"id":6,"name":27,"category":28,"favorite":29},"(结构) 专业基础考试一级","建筑工程",0]