[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-927542":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},927542,598,1,"单选题","对于一个简支梁进行均布加荷，当仅需量测试件的最大挠度值时，所用的位移计至少应当为（ ）个。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":14},"B","2",{"key":19,"text":20,"correct":21},"C","3",true,{"key":23,"text":24,"correct":14},"D","5","当量测试件达到最大挠度值时，为了测得真正的最大挠度值，需要量测构件两端支座处支承面的刚性位移或沉降值，至少要按图所示布置三个测点。",{"id":6,"name":27,"category":28,"favorite":29},"(结构) 专业基础考试一级","建筑工程",0]