[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-927072":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},927072,598,1,"单选题","某二层楼进行固定节拍专业流水施工，每层施工段数为3，施工过程有3个，流水节拍为2d，流水工期为（ ）d。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","8",false,{"key":16,"text":17,"correct":14},"B","10",{"key":19,"text":20,"correct":14},"C","12",{"key":22,"text":23,"correct":24},"D","16",true,"固定节拍流水施工的流水工期为：（m+n－1）t=（3×2+3－1）×2＝16d。式中，n为施工过程数；m为施工段数；t为流水节拍。",{"id":6,"name":27,"category":28,"favorite":29},"(结构) 专业基础考试一级","建筑工程",0]