[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-926972":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},926972,598,1,"单选题","建设项目需要配套建设的环境保护设施，必须与主体工程实行“三同时”。“三同时”是指（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","同时勘察、同时投资、同时组织验收",false,{"key":16,"text":17,"correct":14},"B","同时招标、同时拨款、同时竣工结算",{"key":19,"text":20,"correct":21},"C","同时设计、同时施工、同时投产使用",true,{"key":23,"text":24,"correct":14},"D","同时征地、同时建设、同时营利纳税","《建设项目环境保护设计规定》第五条规定，环境保护设计必须按国家规定的设计程序进行，执行环境影响报告书（表）的编审制度，执行防治污染及其他公害的设施与主体工程同时设计、同时施工、同时投产的“三同时”制度。",{"id":6,"name":27,"category":28,"favorite":29},"(结构) 专业基础考试一级","建筑工程",0]