[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-926848":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},926848,598,1,"单选题","对砌体墙进行低周反复加载试验时，下列哪一项做法是不正确的？",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","水平反复荷载在墙体开裂前采用荷载控制",false,{"key":16,"text":17,"correct":14},"B","墙体开裂后按位移进行控制",{"key":19,"text":20,"correct":14},"C","通常以开裂位移为控制参数，按开裂位移的倍数逐级加载",{"key":22,"text":23,"correct":24},"D","按位移控制加载时，应使骨架曲线出现下降段，下降到极限荷载的80%，试验结束",true,"提示：用砌体砌筑的墙体，进行低周反复加载试验时，为便于发现墙体开裂和开裂荷载，开裂前按荷载控制，幵裂后按幵裂位移的倍数逐级增加进行控制，直到骨架曲线出现下降段，荷载下降到85%的极限荷载，试验结束。",{"id":6,"name":27,"category":28,"favorite":29},"(结构) 专业基础考试一级","建筑工程",0]