[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-597-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},597,"(结构) 基础考试一级","建筑工程",0,15,50,2915,[13,34,46,58,70,82,94,106,118,130,142,154,166,176,188,196,204,216,228,240,252,264,276,288,298,310,322,334,346,358,370,382,394,406,418,430,442,454,462,474,483,495,507,519,531,542,554,566,578,590],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},923833,1,"单选题","某企业拟投资生产一种产品，设计生产能力为15万件\u002F年，单位产品可变成本120元，总固定成本1500万元，达到设计生产能力时，保证企业不亏损的单位产品售价最低为：",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","150 元",false,{"key":24,"text":25,"correct":22},"B","200 元",{"key":27,"text":28,"correct":29},"C","220 元",true,{"key":31,"text":32,"correct":22},"D","250 元","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},923834,"对项目进行单因素敏感性分析时，以下各项中，可作为敏感性分析因素的是：",[38,40,42,44],{"key":20,"text":39,"correct":22},"净现值",{"key":24,"text":41,"correct":22},"年值",{"key":27,"text":43,"correct":22},"内部收益率",{"key":31,"text":45,"correct":29},"折现率",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},923835,"为了判断某种因素对财务或经济评价指标的影响，敏感性分析采取的分析方法是：",[50,52,54,56],{"key":20,"text":51,"correct":22},"对不同评价指标进行比较",{"key":24,"text":53,"correct":29},"考察不确定性因素的变化导致评价指标的变化幅度",{"key":27,"text":55,"correct":22},"考察盈亏平衡点的变化对评价指标的影响",{"key":31,"text":57,"correct":22},"计算不确定因素变动的概率分布并分析对方案的影响",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},923836,"对某项目进行敏感性分析，采用的评价指标为内部收益，基本方案的内部收益率为15%，当不确定性因素原材料价格增加10%时，内部收益率为13%，则原材料的敏感度系数为：",[62,64,66,68],{"key":20,"text":63,"correct":22},"-1. 54",{"key":24,"text":65,"correct":29},"-1. 33",{"key":27,"text":67,"correct":22},"1. 33",{"key":31,"text":69,"correct":22},"1. 54",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},923837,"对某项目投资方案进行单因素敏感性分析，基准收益率15%，采用内部收益率作为评价指标，投资额、经营成本、销售收入为不确定性因素，计算其变化对IRR的影响如表所示。则敏感性因素按对评价指标影响的程度从大到小排列依次为：",[74,76,78,80],{"key":20,"text":75,"correct":22},"投资额、经营成本、销售收入",{"key":24,"text":77,"correct":29},"销售收入、经营成本、投资额",{"key":27,"text":79,"correct":22},"经营成本、投资额、销售收入",{"key":31,"text":81,"correct":22},"销售收入、投资额、经营成本",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},923838,"对某投资方案进行单因素敏感性分析，选取的分析指标为净现值NPV，考虑投资额、产品价格、经营成本为不确定性因素，计算结果如图所示，则敏感性大小依次为：",[86,88,90,92],{"key":20,"text":87,"correct":22},"经营成本、投资额、产品价格",{"key":24,"text":89,"correct":22},"投资额、经营成本、产品价格",{"key":27,"text":91,"correct":22},"产品价格、投资额、经营成本",{"key":31,"text":93,"correct":29},"产品价格、经营成本、投资额",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},923839,"对某投资项目进行敏感性分析，采用的评价指标为内部收益率，基准收益率为15%，基本方案的内部收益率为18%，对于不确定性因素销售收入，当销售收入降低10%，内部收益率为15%时，销售收入变化的临界点为：",[98,100,102,104],{"key":20,"text":99,"correct":29},"-10%",{"key":24,"text":101,"correct":22},"3%",{"key":27,"text":103,"correct":22},"10%",{"key":31,"text":105,"correct":22},"15%",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},923840,"已知甲、乙为两个寿命期相同的互斥项目，其中乙项目投资大于甲项目。通过测算得出甲、乙两项目的内部收益率分别为17%和14%，增量内部收益AIRR（乙-甲）= 13%，基准收益率为14%，以下说法中正确的是：",[110,112,114,116],{"key":20,"text":111,"correct":29},"应选择甲项目",{"key":24,"text":113,"correct":22},"应选择乙项目",{"key":27,"text":115,"correct":22},"应同时选择甲、乙两个项目",{"key":31,"text":117,"correct":22},"甲、乙两项目均不应选择",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},923841,"下列项目方案类型中，适于采用净现值法直接进行方案选优的是：",[122,124,126,128],{"key":20,"text":123,"correct":22},"寿命期相同的独立方案",{"key":24,"text":125,"correct":22},"寿命期不同的独立方案",{"key":27,"text":127,"correct":29},"寿命期相同的互斥方案",{"key":31,"text":129,"correct":22},"寿命期不同的互斥方案",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},923842,"采用净现值(NPV)、内部收益率(IRR)和差额内部收益率(ΔIRR)进行互斥方案比选，它们的评价结论是：",[134,136,138,140],{"key":20,"text":135,"correct":22},"NPV和ΔIRR总是不一致的",{"key":24,"text":137,"correct":22},"IRR和ΔIRR总是一致的",{"key":27,"text":139,"correct":29},"NPV和ΔIRR总是一致的",{"key":31,"text":141,"correct":22},"NPV、IRR和ΔIRR总是不一致的",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},923843,"两个初始投资相同、寿命期相同的投资方案，下列说法中正确的是：",[146,148,150,152],{"key":20,"text":147,"correct":22},"NPV1=NPV2，则IRR1= IRR2",{"key":24,"text":149,"correct":22},"NPV1>NPV2，则IRR1>IRR2",{"key":27,"text":151,"correct":22},"NPV1>NPV2，则IRR12",{"key":31,"text":153,"correct":29},"NPV1>NPV2≥0，则方案 1 较优",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},923844,"某项目有甲乙丙丁4个投资方案，寿命期都是8年，设定的折现率8%，(A\u002FP, 8%,8)=0. 1740，各方案各年的净现金流量如表所示，采用年值法应选用：",[158,160,162,164],{"key":20,"text":159,"correct":22},"甲方案",{"key":24,"text":161,"correct":22},"乙方案",{"key":27,"text":163,"correct":22},"丙方案",{"key":31,"text":165,"correct":29},"丁方案",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},923845,"若两个互斥方案的计算期相同，每年的收益基本相同但无法准确估计，应采用的财务评价指标是：",[170,171,172,174],{"key":20,"text":43,"correct":22},{"key":24,"text":39,"correct":22},{"key":27,"text":173,"correct":22},"投资回收期",{"key":31,"text":175,"correct":29},"费用年值",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":27,"analysis":33},923846,"某项目有三个产出相同的方案，方案寿命期均为10年，期初投资和各年运营费用如表所示，设基准折现率为7%，已知(P\u002F A，7%，10) = 7.204。则方案优劣的排序为：",[180,182,184,186],{"key":20,"text":181,"correct":22},"甲乙丙",{"key":24,"text":183,"correct":22},"甲丙乙",{"key":27,"text":185,"correct":29},"乙甲丙",{"key":31,"text":187,"correct":22},"丙乙甲",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},923847,"有甲乙丙丁四个互斥方案，投资额分别为1000万元、800万元、700万元、600万 元，方案计算期均为10年，基准收益率为15%，计算差额内部收益率结果ΔIRR甲-乙、 ΔIRR乙-丙、ΔIRR丙-丁分别为14. 2%、16%、15.1%，应选择：",[192,193,194,195],{"key":20,"text":159,"correct":22},{"key":24,"text":161,"correct":29},{"key":27,"text":163,"correct":22},{"key":31,"text":165,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":31,"analysis":33},923848,"有甲乙丙丁四个投资方案，设定的基准折现率为12%，已知(A\u002FP,12%,8) = 0. 2013,(A\u002FP,12%,9)=0.1877,(A\u002FP,12%,10)=0. 1770。各方案寿命期及各年净现金流量如表所示，用年值法评价方案，应选择：",[200,201,202,203],{"key":20,"text":159,"correct":22},{"key":24,"text":161,"correct":22},{"key":27,"text":163,"correct":22},{"key":31,"text":165,"correct":29},{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":24,"analysis":33},923849,"在几个产品相同的备选方案比选中，最低价格法是：",[208,210,212,214],{"key":20,"text":209,"correct":22},"按主要原材料推算成本，其中原材料价格较低的方案为优",{"key":24,"text":211,"correct":29},"按净现值为0计算方案的产品价格，其中产品价格较低的方案为优",{"key":27,"text":213,"correct":22},"按市场风险最低推算产品价格，其中产品价格较低的方案为优",{"key":31,"text":215,"correct":22},"按市场需求推算产品价格，其中产品价格较低的方案为优",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":27,"analysis":33},923850,"对两个计算期相等的互斥方案进行经济性比较，不能直接采用：",[220,222,224,226],{"key":20,"text":221,"correct":22},"净现值法",{"key":24,"text":223,"correct":22},"年值法",{"key":27,"text":225,"correct":29},"内部收益率法",{"key":31,"text":227,"correct":22},"净现值率法",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":31,"analysis":33},923851,"以下关于改扩建项目财务分析的说法中正确的是：",[232,234,236,238],{"key":20,"text":233,"correct":22},"应以财务生存能力分析为主",{"key":24,"text":235,"correct":22},"应以项目清偿能力分析为主",{"key":27,"text":237,"correct":22},"应以企业层次为主进行财务分析",{"key":31,"text":239,"correct":29},"应遵循“有无对比”原刚",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":31,"analysis":33},923852,"对于改扩建项目的经济评价，以下表述中正确的是：",[244,246,248,250],{"key":20,"text":245,"correct":22},"仅需要估算“有项目”、“无项目”、“增量”三种状态下的效益和费用",{"key":24,"text":247,"correct":22},"只对项目本身进行经济性评价，不考虑对既有企业的影响",{"key":27,"text":249,"correct":22},"财务分析一般只按项目一个层次进行财务分析",{"key":31,"text":251,"correct":29},"需要合理确定原有资产利用、停产损失和沉没成本",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":27,"analysis":33},923853,"下面关于价值工程的论述中正确的是：",[256,258,260,262],{"key":20,"text":257,"correct":22},"价值工程中的价值是指成本与功能的比值",{"key":24,"text":259,"correct":22},"价值工程中的价值是指产品消耗的必要劳动时间",{"key":27,"text":261,"correct":29},"价值工程中的成本是指寿命周期成本，包括产品在寿命期内发生的全部费用",{"key":31,"text":263,"correct":22},"价值工程中的成本就是产品的生产成本，它随着产品功能的增加而提高",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":24,"analysis":33},923854,"某项目由 A、 B、 C、D四个部分组成，当采用强制确定法进行价值工程对象选择时，它们的价值指数分别如下所示。其中不应作为价值工程分析对象的是：",[268,270,272,274],{"key":20,"text":269,"correct":22},"0. 7559",{"key":24,"text":271,"correct":29},"1. 0000",{"key":27,"text":273,"correct":22},"1. 2245",{"key":31,"text":275,"correct":22},"1. 5071",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":24,"analysis":33},923856,"价值工程的“价值(V)”对于产品来说，可以表示为V=F\u002F C，F指产品的功能，而C则是指：",[280,282,284,286],{"key":20,"text":281,"correct":22},"产品的制造成本",{"key":24,"text":283,"correct":29},"产品的寿命周期成本",{"key":27,"text":285,"correct":22},"产品的使用成本",{"key":31,"text":287,"correct":22},"产品的研发成本",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":20,"analysis":33},923857,"价值工程的“价值V”对于产品来说，可以表示为V=F\u002F C，式中C是指：",[292,293,295,296],{"key":20,"text":283,"correct":29},{"key":24,"text":294,"correct":22},"产品的开发成本",{"key":27,"text":281,"correct":22},{"key":31,"text":297,"correct":22},"产品的销售成本",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},923858,"价值工程的核心是:",[302,304,306,308],{"key":20,"text":303,"correct":22},"尽可能降低产品成本",{"key":24,"text":305,"correct":22},"降低成本提高产品价格",{"key":27,"text":307,"correct":29},"功能分析",{"key":31,"text":309,"correct":22},"有组织的活动",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},923859,"某企业原采用甲工艺生产某种产品，现采用新技术乙工艺生产，不仅达到甲工艺相同的质量，而且成本降低了15%。根据价值工程原理，该企业提高产品价值的途径是：",[314,316,318,320],{"key":20,"text":315,"correct":29},"功能不变，成本降低",{"key":24,"text":317,"correct":22},"功能和成本都降低，但成本降幅较大",{"key":27,"text":319,"correct":22},"功能提高，成本降低",{"key":31,"text":321,"correct":22},"功能提高，成本不变",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},923860,"已知某产品的零件甲的功能评分为5，成本为20元，该产品各零件功能积分之和为40，产品成本为100元，则零件甲的价值系数为：",[326,328,330,332],{"key":20,"text":327,"correct":22},"0. 2",{"key":24,"text":329,"correct":29},"0. 625",{"key":27,"text":331,"correct":22},"0. 8",{"key":31,"text":333,"correct":22},"1. 6",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},923861,"某企业价值工程工作人员对某产品分析，计算得到4个部件的价值系数如表所示，应选择作为价值工程分析对象的部件是：",[338,340,342,344],{"key":20,"text":339,"correct":22},"甲",{"key":24,"text":341,"correct":22},"乙",{"key":27,"text":343,"correct":22},"丙",{"key":31,"text":345,"correct":29},"丁",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},923862,"根据《建筑法》规定，某建设单位领取了施工许可证，下列情节中，可能不导致施工许可证废止的是：",[350,352,354,356],{"key":20,"text":351,"correct":22},"领取施工许可证之日起三个月内因故不能按期开工，也未申请延期",{"key":24,"text":353,"correct":29},"领取施工许可证之日起按期开工后又中止施工",{"key":27,"text":355,"correct":22},"向发证机关申请延期开工一次，延期之日起三个月内，因故仍不能按期开工，也未申请延期",{"key":31,"text":357,"correct":22},"向发证机关申请延期开工两次，超过6个月因故不能按期开工，继续申请延期",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},923863,"某建设项目甲建设单位与乙施工单位签订施工总承包合同后，乙施工单位经甲建设单位认可，将打桩工程分包给丙专业承包单位，丙专业承包单位又将劳务作业分包给丁劳务单位，由于丙专业承包单位从业人员责任心不强，导致该打桩工程部分出现了质量缺陷，对于该质量缺陷的责任承担，以下说明正确的是：",[362,364,366,368],{"key":20,"text":363,"correct":29},"乙单位和丙单位承担连带责任",{"key":24,"text":365,"correct":22},"丙单位和丁单位承担连带责任",{"key":27,"text":367,"correct":22},"丙单位向甲单位承担全部责任",{"key":31,"text":369,"correct":22},"乙、丙、丁三单位共同承担责任",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},923864,"国家对从事建设工程勘察、设计活动的单位实行：",[374,376,378,380],{"key":20,"text":375,"correct":22},"资格管理制度",{"key":24,"text":377,"correct":29},"资质管理制度",{"key":27,"text":379,"correct":22},"注册管理制度",{"key":31,"text":381,"correct":22},"执业管理制度",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},923865,"建筑工程开工前，建设单位应当按照国家有关规定申请领取施工许可证， 颁发施工许可证的单位应该是：",[386,388,390,392],{"key":20,"text":387,"correct":22},"县级以上人民政府建设行政主管部门",{"key":24,"text":389,"correct":22},"工程所在地县级以上人民政府建设工程监督部门",{"key":27,"text":391,"correct":22},"工程所在地省级以上人民政府建设行政主管部门",{"key":31,"text":393,"correct":29},"工程所在地县级以上人民政府建设行政",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},923866,"建设单位在领取开工证之后，应当在几个月内开工？",[398,400,402,404],{"key":20,"text":399,"correct":29},"3",{"key":24,"text":401,"correct":22},"6",{"key":27,"text":403,"correct":22},"9",{"key":31,"text":405,"correct":22},"12",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},923867,"关于建筑工程监理，下列哪种描述是正确的？",[410,412,414,416],{"key":20,"text":411,"correct":22},"所有国内的工程都应监理",{"key":24,"text":413,"correct":22},"由业主决定是否要监理",{"key":27,"text":415,"correct":29},"国务院可以规定实行强制监理的工程范围",{"key":31,"text":417,"correct":22},"监理是一种服务，所以不能强迫业主接受监理服务",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},923868,"施工许可证的申请者是：",[422,424,426,428],{"key":20,"text":423,"correct":22},"监理单位",{"key":24,"text":425,"correct":22},"设计单位",{"key":27,"text":427,"correct":22},"施工单位",{"key":31,"text":429,"correct":29},"建设单位",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},923869,"监理与工程施工的关系，下列表述中哪一项不合适？",[434,436,438,440],{"key":20,"text":435,"correct":22},"工程施工不符合设计要求的，监理人员有权要求施工企业改正",{"key":24,"text":437,"correct":22},"工程施工不符技术标准要求的，监理人员有权要求施工企业改正",{"key":27,"text":439,"correct":22},"工程施工不符合合同约定要求的，监理人员有权要求施工企业改正",{"key":31,"text":441,"correct":29},"监理人员人为设计不符合质量标准的，有权要求设计人员改正",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":27,"analysis":33},923870,"违法分包是指下列中的哪几项？ ①总承包单位将建设工程分包给不具备相应资质条件的单位； ②总承包单位将建设工程主体分包给其他单位； ③分包单位将其承包的工程再分包的； ④分包单位多于3个以上的。",[446,448,450,452],{"key":20,"text":447,"correct":22},"①",{"key":24,"text":449,"correct":22},"①②③④",{"key":27,"text":451,"correct":29},"①②③",{"key":31,"text":453,"correct":22},"②③④",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":27,"analysis":33},923871,"关于工程建设的承发包问题，下列论述中正确的组合是： ①发包人可以与总承包人订立建设工程合同，也可以分别与勘察人、设计人、施工人订立勘察、设计、施工承包合同； ②发包人不得将应当由一个承包人完成的建设工程肢解成若干部分发包给几个承包人； ③总承包人或者勘察、设计、施工承包人经发包人同意，可以将自己承包的部分工作交由第三人完成，第三人就其完成的工作成果与总承包人或者勘察、设计、施工承包人向发包人承担连带责任； ④分包单位可以并只能将其承包的工程再分包一次。",[458,459,460,461],{"key":20,"text":447,"correct":22},{"key":24,"text":449,"correct":22},{"key":27,"text":451,"correct":29},{"key":31,"text":453,"correct":22},{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},923872,"《中华人民共和国建筑法》中所指的建筑活动是：",[466,468,470,472],{"key":20,"text":467,"correct":22},"各类房屋建筑",{"key":24,"text":469,"correct":29},"各类房屋建筑及其附属设施的建造和与其配套的线路、管道、设备的安装活动",{"key":27,"text":471,"correct":22},"国内的所有建筑工程",{"key":31,"text":473,"correct":22},"国内所有工程，包括中国企业在境外承包的工程",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},923873,"监理的依据是以下哪几项？ ①法规； ②技术标准； ③设计文件； ④工程承包合同",[478,479,480,481],{"key":20,"text":449,"correct":29},{"key":24,"text":447,"correct":22},{"key":27,"text":451,"correct":22},{"key":31,"text":482,"correct":22},"④",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":20,"analysis":33},923874,"两个以上不同资质等级的单位如何联合共同承包工程？",[487,489,491,493],{"key":20,"text":488,"correct":29},"应当按照资质等级低的单位的业务许可范围承揽工程",{"key":24,"text":490,"correct":22},"按任何一个单位的资质承包均可",{"key":27,"text":492,"correct":22},"应当按照资质等级高的单位的业务许可范围承揽工程",{"key":31,"text":494,"correct":22},"不允许联合承包",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":27,"analysis":33},923875,"建筑法中规定了申领开工证的必备条件，下列条件中哪项不符合建筑法的要求？",[499,501,503,505],{"key":20,"text":500,"correct":22},"已办理用地手续材料",{"key":24,"text":502,"correct":22},"已确定施工企业",{"key":27,"text":504,"correct":29},"已有了方案设计图",{"key":31,"text":506,"correct":22},"资金已落实",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":20,"analysis":33},923876,"我国推行建筑工程监理制度的项目范围应该是：",[511,513,515,517],{"key":20,"text":512,"correct":29},"由国务院规定实行强制监理的建筑工程的范围",{"key":24,"text":514,"correct":22},"所有工程必须强制接受监理",{"key":27,"text":516,"correct":22},"由业主自行决定是否聘请监理",{"key":31,"text":518,"correct":22},"只有国家投资的项目才需要监理",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":20,"analysis":33},923877,"工程监理人员发现工程设计不符合建筑工程质量标准或者合同约定的质量要求的应当：",[523,525,527,529],{"key":20,"text":524,"correct":29},"报告建设单位要求设计单位改正",{"key":24,"text":526,"correct":22},"书面要求设计单位改正",{"key":27,"text":528,"correct":22},"报告上级主管部门",{"key":31,"text":530,"correct":22},"要求施工单位改正",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":27,"analysis":33},923878,"监理工程师不得在以下哪些单位兼职？ ①工程设计 ②工程施工 ③材料供应 ④政府机构 ⑤科学研究 ⑥设备厂家",[535,536,538,540],{"key":20,"text":449,"correct":22},{"key":24,"text":537,"correct":22},"②③④⑤",{"key":27,"text":539,"correct":29},"②③④⑥",{"key":31,"text":541,"correct":22},"①②③④⑥",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":31,"analysis":33},923879,"某施工单位一个有职工185人的三级施工资质的企业，根据《安全生产法》规定，该企业下列行为中合法的是：",[546,548,550,552],{"key":20,"text":547,"correct":22},"只配备兼职的安全生产管理人员",{"key":24,"text":549,"correct":22},"委托具有国家规定相关专业技术资格的工程技术人员提供安全生产管理服 务，由其负责承担保证安全生产的责任",{"key":27,"text":551,"correct":22},"安全生产管理人员经企业考核后即任职",{"key":31,"text":553,"correct":29},"设置安全生产管理机构",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":20,"analysis":33},923880,"根据《安全生产法》的规定，生产经营单位主要负责人对本单位的安全生产负总责，某生产经营单位的主要负责人对本单位安全生间工作的职责是：",[558,560,562,564],{"key":20,"text":559,"correct":29},"建立、健全本单位安全生产责任制",{"key":24,"text":561,"correct":22},"保证本单位安全生产投入的有效使用",{"key":27,"text":563,"correct":22},"及时报告生产安全事故",{"key":31,"text":565,"correct":22},"组织落实本单位安全生产规章制度和操作规程",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":20,"analysis":33},923881,"重点工程建设项目应当坚持：",[570,572,574,576],{"key":20,"text":571,"correct":29},"安全第一的原则",{"key":24,"text":573,"correct":22},"为保证工程质量不怕牺牲",{"key":27,"text":575,"correct":22},"确保进度不变的原则",{"key":31,"text":577,"correct":22},"投资不超过预算的原则",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},923882,"对本单位的安全生产工作全面负责的人员应当是：",[582,584,586,588],{"key":20,"text":583,"correct":29},"生产经营单位的主要负责人",{"key":24,"text":585,"correct":22},"主管安全生产工作的副手",{"key":27,"text":587,"correct":22},"项目经理",{"key":31,"text":589,"correct":22},"专职安全员",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":24,"analysis":33},923883,"下列属于《招标投标法》规定的招标方式是：",[594,596,598,600],{"key":20,"text":595,"correct":22},"公开招标和直接招标",{"key":24,"text":597,"correct":29},"公开招标和邀请招标",{"key":27,"text":599,"correct":22},"公开招标和协议招标",{"key":31,"text":601,"correct":22},"公开招标和公开招标",[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]