[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-597-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},597,"(结构) 基础考试一级","建筑工程",0,14,50,2915,[13,34,46,58,70,82,94,106,118,130,142,154,165,177,189,199,211,223,235,247,258,270,282,294,306,318,330,342,354,365,377,388,400,412,424,436,448,459,471,483,495,507,519,531,543,555,567,578,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},923783,1,"单选题","无形资产是企业资产的重要组成部分，它的特点是会遭受：",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","有形磨损和无形磨损",false,{"key":24,"text":25,"correct":22},"B","有形磨损",{"key":27,"text":28,"correct":29},"C","无形磨损",true,{"key":31,"text":32,"correct":22},"D","物理磨损","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},923784,"某企业预计明年销售收入将达到6000万元，总成本费用将为5600万元，该企业明年应缴纳：",[38,40,42,44],{"key":20,"text":39,"correct":22},"销售税金",{"key":24,"text":41,"correct":22},"所得税",{"key":27,"text":43,"correct":22},"固定资产投资方向调节税",{"key":31,"text":45,"correct":29},"所得税和销售税金",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},923785,"固定成本是总成本费用的一部分，它是指其中的：",[50,52,54,56],{"key":20,"text":51,"correct":22},"不随产量变动而变动的费用",{"key":24,"text":53,"correct":22},"不随生产规模变动而变动的费用",{"key":27,"text":55,"correct":22},"不随人员变动而变动的费用",{"key":31,"text":57,"correct":29},"在一定生产规模限度内不随产量变动而变动的费用",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},923786,"构成建设项目总投资的三部分费用是：",[62,64,66,68],{"key":20,"text":63,"correct":22},"工程费用、预备费、流动资金",{"key":24,"text":65,"correct":29},"建设投资、建设期利息、流动资金",{"key":27,"text":67,"correct":22},"建设投资、建设期利息、预备费",{"key":31,"text":69,"correct":22},"建筑安装工程费、工程建设其他费用、预备费",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},923787,"某新建项目，建设期2年，第1年年初借款1500万元，第2年年初借款1000万元，借款按年计息，利率为7%，建设期内不支付利息，第2年借款利息为：",[74,76,78,80],{"key":20,"text":75,"correct":22},"70 万元",{"key":24,"text":77,"correct":22},"77. 35 万元",{"key":27,"text":79,"correct":22},"175 万元",{"key":31,"text":81,"correct":29},"182. 35 万元",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},923788,"某公司购买一台计算机放置一年未用，一年期间又有新型号计算机出现，原购买的计算机的损耗为：",[86,88,90,92],{"key":20,"text":87,"correct":22},"有形损耗",{"key":24,"text":89,"correct":22},"物理损耗",{"key":27,"text":91,"correct":22},"自然损耗",{"key":31,"text":93,"correct":29},"无形损耗",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},923789,"某建设项目固定资产投资1140万元，建设期贷款利息为150万元，折旧年限20年，预计净残值80万元，则该项目按直线折旧的年折旧额为：",[98,100,102,104],{"key":20,"text":99,"correct":22},"48. 5万元",{"key":24,"text":101,"correct":22},"50. 5万元",{"key":27,"text":103,"correct":22},"53. 0万元",{"key":31,"text":105,"correct":29},"60. 5万元",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},923790,"某企业购置一台设备，固定资产原值为20万元，采用双倍余额递减法折旧，折旧年限为10年，则该设备第2年折旧额为：",[110,112,114,116],{"key":20,"text":111,"correct":22},"2万元",{"key":24,"text":113,"correct":22},"2. 4万元",{"key":27,"text":115,"correct":29},"3. 2万元",{"key":31,"text":117,"correct":22},"4. 0万元",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},923791,"某工业企业预计今年销售收入可达8000万元，总成本费用为8200万元，则该企业今年可以不缴纳:",[122,124,126,128],{"key":20,"text":123,"correct":29},"企业所得税",{"key":24,"text":125,"correct":22},"营业税金及附加",{"key":27,"text":127,"correct":22},"企业自有车辆的车船税",{"key":31,"text":129,"correct":22},"企业自有房产的房产税",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},923792,"在建设项目总投资中，以下应计入固定资产原值的是：",[134,136,138,140],{"key":20,"text":135,"correct":29},"建设期利息",{"key":24,"text":137,"correct":22},"外购专利权",{"key":27,"text":139,"correct":22},"土地使用权",{"key":31,"text":141,"correct":22},"开办费",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},923793,"某公司向银行借款500 0万元，期限为5 年，年利率为1 0 % ，每年年末付息一次，到期一次还本，企业所得税率为2 5 % 。若不考虑筹资费用，该项借款的资金成本率是：",[146,148,150,152],{"key":20,"text":147,"correct":29},"7.5%",{"key":24,"text":149,"correct":22},"10%",{"key":27,"text":151,"correct":22},"12. 5%",{"key":31,"text":153,"correct":22},"37. 5%",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},923794,"某投资项目全投资的净现金流量如下表： 若该项目初始投资中借款比例为50%，贷款年利率为8%，初始投资中自有资金的筹资成本为12%，则当计算该项目自有资金的净现值时，基准折现率至少应取：",[158,159,161,163],{"key":20,"text":149,"correct":22},{"key":24,"text":160,"correct":29},"12%",{"key":27,"text":162,"correct":22},"8%",{"key":31,"text":164,"correct":22},"20%",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},923795,"某项目有一项融资，税后资金成本为6. 5%，若通货膨胀率为2%，则考虑通货膨胀的资金成本为：",[169,171,173,175],{"key":20,"text":170,"correct":29},"4.4%",{"key":24,"text":172,"correct":22},"5.4%",{"key":27,"text":174,"correct":22},"6.4%",{"key":31,"text":176,"correct":22},"8. 7%",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},923796,"某扩建项目总投资1000万元，筹集资金的来源为:原有股东增资400万元，资金成本为15%；银行长期借款600万元，年实际利率为6%。该项目年初投资当年获利，所得税税率25%，该项目所得税后加权平均资金成本为：",[181,183,185,187],{"key":20,"text":182,"correct":22},"7.2%",{"key":24,"text":184,"correct":29},"8.7%",{"key":27,"text":186,"correct":22},"9.6%",{"key":31,"text":188,"correct":22},"10.5%",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},923797,"某项目总投资13000万元，融资方案为:普通股5000万元，资金成本为16%；银行长期借款8000万元，税后资金成本为8%。该项目的加权平均资金成本为：",[193,194,196,197],{"key":20,"text":149,"correct":22},{"key":24,"text":195,"correct":29},"11%",{"key":27,"text":160,"correct":22},{"key":31,"text":198,"correct":22},"13%",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":27,"analysis":33},923798,"某项目从银行借款1000万元，年利率为6 %，期限10年，按年度还款，每年年末偿还本金100万元，并偿还相应未还本金的利息。该偿还债务方式为：",[203,205,207,209],{"key":20,"text":204,"correct":22},"等额利息法",{"key":24,"text":206,"correct":22},"等额本息法",{"key":27,"text":208,"correct":29},"等额本金法",{"key":31,"text":210,"correct":22},"偿债基金法",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},923799,"某项目从银行贷款500万元，期限5年，年利率5%，采取等额还本利息照付方式还本付息，每年末还本付息一次，第2年应付利息是：",[215,217,219,221],{"key":20,"text":216,"correct":22},"5万元",{"key":24,"text":218,"correct":29},"20万元",{"key":27,"text":220,"correct":22},"23万元",{"key":31,"text":222,"correct":22},"25万元",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":27,"analysis":33},923800,"某项目第6年累计净现金流量开始出现正值，第五年末累计净现金流量为-60万元，第6年当年净现金流量为240万元，则该项目的静态投资回收期为：",[227,229,231,233],{"key":20,"text":228,"correct":22},"4. 25 年",{"key":24,"text":230,"correct":22},"4. 75 年",{"key":27,"text":232,"correct":29},"5. 25 年",{"key":31,"text":234,"correct":22},"6. 25 年",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":31,"analysis":33},923801,"某项目初期(第0年年初)投资额为5000万元，此后从第二年年末开始每年有相同的净收益，收益期为10年。寿命期结束时的净残值为零，若基准收益率为15%，则要使该投资方案的净现值为零，其年净收益应为： [已知：（PM，15%，10）=5.0188，（P\u002F F，15%，1）=0.8696]",[239,241,243,245],{"key":20,"text":240,"correct":22},"574. 98 万元",{"key":24,"text":242,"correct":22},"866. 31 万元",{"key":27,"text":244,"correct":22},"996. 25 万元",{"key":31,"text":246,"correct":29},"1145. 65 万元",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":31,"analysis":33},923802,"对于某常规项目（IRR唯一），当设定折现率为12%时，求得的净现值为130万元；当设定折现率为14%时，求得的净SB值为-50万元，则该项目的内部收益率应是：",[251,253,255,256],{"key":20,"text":252,"correct":22},"11.56%",{"key":24,"text":254,"correct":22},"12.77%",{"key":27,"text":198,"correct":22},{"key":31,"text":257,"correct":29},"13.44%",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},923803,"下列财务评价指标中，反映项目偿债能力的指标是：",[262,264,266,268],{"key":20,"text":263,"correct":22},"投资回收期",{"key":24,"text":265,"correct":29},"利息备付率",{"key":27,"text":267,"correct":22},"财务净现值",{"key":31,"text":269,"correct":22},"总投资收益率",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},923804,"在投资项目盈利能力分析中，若选取的基准年发生变动，则该项目的净现值(NPV)的内部收益率(IRR)的数值将是：",[274,276,278,280],{"key":20,"text":275,"correct":29},"NPV变IRR不变",{"key":24,"text":277,"correct":22},"NPV和IRR均变",{"key":27,"text":279,"correct":22},"NPV不变IRR变",{"key":31,"text":281,"correct":22},"NPV和IRR均不变",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":27,"analysis":33},923805,"投资项目W的净现金流量如下表： 则项目W的静态投资回收期为：",[286,288,290,292],{"key":20,"text":287,"correct":22},"3. 65 年",{"key":24,"text":289,"correct":22},"3. 87 年",{"key":27,"text":291,"correct":29},"3 年",{"key":31,"text":293,"correct":22},"3. 55 年",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":20,"analysis":33},923806,"某投资项目，当基准折现率取15%时，项目的净现值等于零，则该项目的内部收益率：",[298,300,302,304],{"key":20,"text":299,"correct":29},"等于15%",{"key":24,"text":301,"correct":22},"大于15%",{"key":27,"text":303,"correct":22},"等于0",{"key":31,"text":305,"correct":22},"小于15%",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},923807,"采用净现值指标对某项目进行财务盈利能力分析，设定的折现率为i，该项目财务上可行的条件是：",[310,312,314,316],{"key":20,"text":311,"correct":22},"NPV≤企业可接受的水平",{"key":24,"text":313,"correct":22},"NPV",{"key":27,"text":315,"correct":29},"NPV≥0",{"key":31,"text":317,"correct":22},"NPV>i",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":31,"analysis":33},923808,"对建设项目进行财务现金流量分析时，若采用的折现率提高，则该项目：",[322,324,326,328],{"key":20,"text":323,"correct":22},"净现金流量减少，财务净现值减小",{"key":24,"text":325,"correct":22},"净现金流量增加，财务净现值增加",{"key":27,"text":327,"correct":22},"净现金流量减少，财务净现值增加",{"key":31,"text":329,"correct":29},"净现金流量不变，财务净现值减小",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":31,"analysis":33},923809,"某投资项目一次性投资200万元，当年投产并收益，评价该项目的财务盈利能力时，计算财务净现值选取的基准收益率为ic，若财务内部收益率小于ic，则有：",[334,336,338,340],{"key":20,"text":335,"correct":22},"ic低于贷款利率",{"key":24,"text":337,"correct":22},"内部收益率低于贷款利率",{"key":27,"text":339,"correct":22},"净现值大于零",{"key":31,"text":341,"correct":29},"净现值小于零",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":27,"analysis":33},923810,"设选取的基准收益率为ic，如果某投资方案在财务上可行，则有：",[346,348,350,352],{"key":20,"text":347,"correct":22},"财务净现值小于零，财务内部收益率大于ic",{"key":24,"text":349,"correct":22},"财务净现值小于零，财务内部收益率小于ic",{"key":27,"text":351,"correct":29},"财务净现值不小于零，财务内部收益率不小于ic",{"key":31,"text":353,"correct":22},"财务净现值不小于零，财务内部收益率小于ic",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":31,"analysis":33},923811,"某小区建设一块绿地，需一次性投资20万元，每年维护费用5万元，设基准折现率10%，绿地使用10年，则费用年值为：",[358,360,361,363],{"key":20,"text":359,"correct":22},"4. 750万元",{"key":24,"text":216,"correct":22},{"key":27,"text":362,"correct":22},"7. 250万元",{"key":31,"text":364,"correct":29},"8. 255万元",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":20,"analysis":33},923812,"某项目总投资为2000万元，投产后正常年份运营期每年利息支出为150万元，若使总投资收益率不低于20%，则年利润总额至少为：",[369,371,373,375],{"key":20,"text":370,"correct":29},"250万元",{"key":24,"text":372,"correct":22},"370万元",{"key":27,"text":374,"correct":22},"400万元",{"key":31,"text":376,"correct":22},"550万元",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},923813,"某项目建设投资400万元，建设期贷款利息40万元，流动资金60万元。投产后正常运营期每年净利润为60万元，所得税为20万元，利息支出为10万元。则该项目的总投资收益率为：",[381,383,385,387],{"key":20,"text":382,"correct":22},"19.6%",{"key":24,"text":384,"correct":29},"18%",{"key":27,"text":386,"correct":22},"16%",{"key":31,"text":160,"correct":22},{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":27,"analysis":33},923814,"某项目总投资16000万元，资本金5000万元。预计项目运营期总投资收益率为20%，年利息支出为900万元，所得税率为25%，则该项目的资本金利润率为：",[392,394,396,398],{"key":20,"text":393,"correct":22},"30%",{"key":24,"text":395,"correct":22},"32. 4%",{"key":27,"text":397,"correct":29},"34. 5%",{"key":31,"text":399,"correct":22},"48%",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":27,"analysis":33},923815,"某企业去年利润总额300万元，上缴所得税75万元，在成本中列支的利息100 万元，折旧和摊销费30万元，还本金额120万元，该企业去年的偿债备付率为：",[404,406,408,410],{"key":20,"text":405,"correct":22},"1. 34",{"key":24,"text":407,"correct":22},"1. 55",{"key":27,"text":409,"correct":29},"1. 61",{"key":31,"text":411,"correct":22},"2. 02",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":31,"analysis":33},923816,"判断投资项目在财务上的生存能力所依据的指标是：",[416,418,420,422],{"key":20,"text":417,"correct":22},"内部收益率和净现值",{"key":24,"text":419,"correct":22},"利息备付率和偿债备付率",{"key":27,"text":421,"correct":22},"投资利润率和资本金利润率",{"key":31,"text":423,"correct":29},"各年净现金流量和累计盈余资金",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},923817,"下列关于现金流量表的表述中，说法不正确的是：",[428,430,432,434],{"key":20,"text":429,"correct":22},"项目资本金现金流量表反映投资者各方权益投资的获利能力",{"key":24,"text":431,"correct":29},"项目资本金现金流量表考虑了融资，属于融资后分析",{"key":27,"text":433,"correct":22},"通过项目投资现金流量表可计算项目财务内部收益、财务净现值等评价指标",{"key":31,"text":435,"correct":22},"项目投资现金流量表以项目所需总投资为计算基础，不考虑融资方案影响",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":27,"analysis":33},923818,"下列关于现金流量表的表述中，正确的是：",[440,442,444,446],{"key":20,"text":441,"correct":22},"项目资本金现金流量表排除了融资方案的影响",{"key":24,"text":443,"correct":22},"通过项目投资现金流量表计算的评价指标反映投资者各方权益投资的获利能力",{"key":27,"text":445,"correct":29},"通过项目投资现金流量表可计算财务内部收益、财务净现值和投资回收期等评价指标",{"key":31,"text":447,"correct":22},"通过项目资本金现金流量表进行的分析反映了项目投资总体的获利能力",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":27,"analysis":33},923819,"项目投资现金流量表中的现金流出不包括：",[452,453,455,457],{"key":20,"text":41,"correct":22},{"key":24,"text":454,"correct":22},"营业税金",{"key":27,"text":456,"correct":29},"利息支出",{"key":31,"text":458,"correct":22},"经营成本",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":27,"analysis":33},923820,"投资项目的现金流量表可分为项目投资和项目资本金现金流量表，以下说法正确的是：",[463,465,467,469],{"key":20,"text":464,"correct":22},"项目投资现金流量表中包括借款本金偿还",{"key":24,"text":466,"correct":22},"项目资本金现金流量表将折旧作为支出列出",{"key":27,"text":468,"correct":29},"项目投资现金流量表考察的是项目本身的财务盈利能力",{"key":31,"text":470,"correct":22},"项目资本金现金流量表中不包括借款利息支付",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":20,"analysis":33},923821,"为了从项目权益投资者整体角度考察盈利能力，应编制：",[475,477,479,481],{"key":20,"text":476,"correct":29},"项目资本金现金流量表",{"key":24,"text":478,"correct":22},"项目投资现金流量表",{"key":27,"text":480,"correct":22},"借款还本付息计划表",{"key":31,"text":482,"correct":22},"资产负债表",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":27,"analysis":33},923822,"以下关于项目经济费用效益分析的说法中正确的是：",[487,489,491,493],{"key":20,"text":488,"correct":22},"经济费用效益分析应考虑沉没成本",{"key":24,"text":490,"correct":22},"经济费用和效益的识别不适用“有无对比”原则",{"key":27,"text":492,"correct":29},"识别经济费用效益时应剔出项目的转移支付",{"key":31,"text":494,"correct":22},"为了反映投入物和产出物真实经济价值，经济费用效益分析不能使用市场价格",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},923823,"下列关于经济效益和经济费用的表述中，正确的是：",[499,501,503,505],{"key":20,"text":500,"correct":22},"经济效益只考虑项目的直接效益",{"key":24,"text":502,"correct":29},"项目对提高社会福利和社会经济所作的贡献都记为经济效益",{"key":27,"text":504,"correct":22},"计算经济费用效益指标采用企业设定的折现率",{"key":31,"text":506,"correct":22},"影子价格是项目投入物和产出物的市场平均价格",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":20,"analysis":33},923824,"对建设项目进行经济费用效益分析所使用的影子汇率的正确含义是：",[511,513,515,517],{"key":20,"text":512,"correct":29},"能正确反映国家外汇经济价值的汇率",{"key":24,"text":514,"correct":22},"—年中外汇牌价的平均汇率",{"key":27,"text":516,"correct":22},"能正确反映国际外汇市场价格的汇率",{"key":31,"text":518,"correct":22},"使项目投入物、产出物的国内市场和国际市场价格等值的汇率",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":27,"analysis":33},923825,"计算经济效益净现值采用的折现率应是：",[523,525,527,529],{"key":20,"text":524,"correct":22},"企业设定的折现率",{"key":24,"text":526,"correct":22},"国债平均利率",{"key":27,"text":528,"correct":29},"社会折现率",{"key":31,"text":530,"correct":22},"银行贷款利率",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":31,"analysis":33},923826,"从经济资源配置的角度判断建设项目可以被接受的条件是：",[535,537,539,541],{"key":20,"text":536,"correct":22},"财务净现值等于或大于零",{"key":24,"text":538,"correct":22},"经济内部收益率等于或小于社会折现率",{"key":27,"text":540,"correct":22},"财务内部收益率等于或大于基准收益率",{"key":31,"text":542,"correct":29},"经济净现值等于或大于零",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":27,"analysis":33},923827,"进行经济费用效益分析时，评价指标效益费用比是指在项目计算期内：",[547,549,551,553],{"key":20,"text":548,"correct":22},"经济净现值与财务净现值之比",{"key":24,"text":550,"correct":22},"经济内部收益率与社会折现率之比",{"key":27,"text":552,"correct":29},"效益流量的现值与费用流量的现值之比",{"key":31,"text":554,"correct":22},"效益流量的累计值与费用流量的累计值之比",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":24,"analysis":33},923828,"某地区为减少水灾损失，拟建水利工程。项目投资预计500万元，计算期按无限年考虑，年维护费20万元。项目建设前每年平均损失300万元。若利率5%，则该项目的费用效益比为：",[559,561,563,565],{"key":20,"text":560,"correct":22},"6.11",{"key":24,"text":562,"correct":29},"6. 67",{"key":27,"text":564,"correct":22},"7. 11",{"key":31,"text":566,"correct":22},"7. 22",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":31,"analysis":33},923829,"某企业生产一种产品，年固定成本为1000万元，单位产品的可变成本为 300元、售价为500元，则其盈亏平衡点的销售收入为：",[571,572,574,576],{"key":20,"text":216,"correct":22},{"key":24,"text":573,"correct":22},"600万元",{"key":27,"text":575,"correct":22},"1500万元",{"key":31,"text":577,"correct":29},"2500万元",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":24,"analysis":33},923830,"成本可分为固定成本和可变成本，假设生产规模一定，以下说法中正确的是",[582,584,586,588],{"key":20,"text":583,"correct":22},"产量增加，但固定成本在单位产品中的成本不变",{"key":24,"text":585,"correct":29},"单位产品中固定成本部分随产量增加而减少",{"key":27,"text":587,"correct":22},"固定成本低于可变成本时才能盈利",{"key":31,"text":589,"correct":22},"固定成本与可变成本相等时利润为零",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":20,"analysis":33},923831,"某吊车生产企业，以产量表示的盈亏平衡点为600台。预计今年的固定成本将增加20%，若其他条件不变，则盈亏平衡点将变为：",[594,596,598,600],{"key":20,"text":595,"correct":29},"720 台",{"key":24,"text":597,"correct":22},"600 台",{"key":27,"text":599,"correct":22},"500 台",{"key":31,"text":601,"correct":22},"480 台",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":20,"analysis":33},923832,"某项目设计生产能力为年产5000台，每台销售价格500元，单位产品可变成本350元，每台产品税金50元，年固定成本265000元，则该项目的盈亏平衡产量为：",[606,608,610,612],{"key":20,"text":607,"correct":29},"2650 台",{"key":24,"text":609,"correct":22},"3500 台",{"key":27,"text":611,"correct":22},"4500 台",{"key":31,"text":613,"correct":22},"5000 台",[615,618,621,624,627,630],{"id":15,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":15},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]