[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-923808":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},923808,597,1,"单选题","对建设项目进行财务现金流量分析时，若采用的折现率提高，则该项目：",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","净现金流量减少，财务净现值减小",false,{"key":16,"text":17,"correct":14},"B","净现金流量增加，财务净现值增加",{"key":19,"text":20,"correct":14},"C","净现金流量减少，财务净现值增加",{"key":22,"text":23,"correct":24},"D","净现金流量不变，财务净现值减小",true,"提示：净现金流量与采用的折现率无关，根据净现金流量函数曲线可以判断折现率与净现值的变化规律。",{"id":6,"name":27,"category":28,"favorite":29},"(结构) 基础考试一级","建筑工程",0]