[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-923512":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},923512,597,1,"单选题","当力P直接作用在简支梁AB的中点时，梁内的&sigma;max超过许用应力值30%。为了消除过载现象，配置了如图所示的辅助梁C D，则此辅助梁的跨度a的长度应为：",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","2. 77m",false,{"key":16,"text":17,"correct":14},"B","5. 54m",{"key":19,"text":20,"correct":14},"C","3m",{"key":22,"text":23,"correct":24},"D","1. 385m",true,"提示：分别求出配置辅助梁前后的最大弯矩，代入配置辅助梁前后的强度条件，加以比较，即可确定a的长度。",{"id":6,"name":27,"category":28,"favorite":29},"(结构) 基础考试一级","建筑工程",0]