[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-923077":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},923077,596,1,"单选题","某城市规划管理部门对建设项目实施管理的内容中，下列哪项是《城乡规划法》规定之外的内容？( )",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设项目选址意见书",false,{"key":16,"text":17,"correct":14},"B","建设用地规划许可证",{"key":19,"text":20,"correct":14},"C","建筑工程规划许可证",{"key":22,"text":23,"correct":24},"D","建设工程方案设计批准书",true,"《中华人民共和国城乡规划法》(中华人民共和国主席令第七十四号)第五十条：在选址意见书、建设用地规划许可征、建设工程规划许可证或者乡村建设规划许可证发放后，因依法修改城乡规划给被许可人合法权益造成损失的，应当依法给予补偿。",{"id":6,"name":27,"category":28,"favorite":29},"设计前期与场地设计","建筑工程",0]