[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-923022":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},923022,596,1,"单选题","",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","由道路中心向道路东、西两侧流",true,{"key":16,"text":17,"correct":18},"B","由道路东、西两侧向道路中心流",false,{"key":20,"text":21,"correct":18},"C","向东排至东部坡地",{"key":23,"text":24,"correct":18},"D","向西排至西部坡地","就道路等高线而言，路中心线为脊，雨水向东、西两侧流。",{"id":6,"name":27,"category":28,"favorite":29},"设计前期与场地设计","建筑工程",0]