[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-923003":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},923003,596,1,"单选题","中国目前执行的设计周期定额中未包含的设计阶段是：( )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计前期工作",true,{"key":16,"text":17,"correct":18},"B","方案设计",false,{"key":20,"text":21,"correct":18},"C","初步设计",{"key":23,"text":24,"correct":18},"D","施工图设计","原国家城乡建设环境保护部颁发了《建筑设计周期定额》，设计周期定额一般划分方案设计、初步设计、施工图设计三个阶段，每个阶段的周期可在总设计周期的控制范围内进行调整。",{"id":6,"name":27,"category":28,"favorite":29},"设计前期与场地设计","建筑工程",0]