[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-922969":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},922969,596,1,"单选题","在建设项目选址报告中对选址方案作比较时，应考虑的主要因素不包括：( )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","土石方工程量",true,{"key":16,"text":17,"correct":18},"B","附近城镇的人口数以及就业率",false,{"key":20,"text":21,"correct":18},"C","拆迁和赔偿数量",{"key":23,"text":24,"correct":18},"D","与城市规划的关系和影响","土石方工程量在建设项目选址报告中对选址方案作比较时，不作为考虑的主要因素。",{"id":6,"name":27,"category":28,"favorite":29},"设计前期与场地设计","建筑工程",0]