[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-922947":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},922947,596,1,"单选题","建筑设计单位制定设计周期和计划进度时应考虑的因素，不包括以下哪项？( )",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目的技术复杂性",false,{"key":16,"text":17,"correct":14},"B","甲方的计划安排",{"key":19,"text":20,"correct":14},"C","人员配备状况",{"key":22,"text":23,"correct":24},"D","设计费的多少",true,"根据有关建筑工程设计法规、基本建设程序及有关规定和建筑工程设计文件深度的规定制定设计周期定额。设计周期定额考虑了各项设计任务一般需要投入的力量。对于技术上复杂而又缺乏设计经验的重要工程，经主管部门批准，在初步设计审批后可以增加技术设计阶段。",{"id":6,"name":27,"category":28,"favorite":29},"设计前期与场地设计","建筑工程",0]