[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-922940":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},922940,596,1,"单选题","下列哪项内容不属于城市规划管理部门协调审查的范围？( )",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","允许开发界限",false,{"key":16,"text":17,"correct":14},"B","建筑限高",{"key":19,"text":20,"correct":14},"C","建筑物沿街立面",{"key":22,"text":23,"correct":24},"D","燃气调压设施面积",true,"城市规划管理部门协调审查的范围包括允许开发界限、建筑沿街立面、建筑限高、建筑退线等，不合燃气调压设施面积。",{"id":6,"name":27,"category":28,"favorite":29},"设计前期与场地设计","建筑工程",0]