[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-922798":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},922798,596,1,"单选题","当基地与道路红线不连接时，应采取何种方法与红线连接？( )",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","改变红线",false,{"key":16,"text":17,"correct":14},"B","扩大用地范围",{"key":19,"text":20,"correct":14},"C","改变邻红线用地地界",{"key":22,"text":23,"correct":24},"D","设通路",true,"《城市道路红线管理办法》第3.4.1条规定，当基地与道路红线不连接时，应采取设通路的方法与红线连接。单车道通路的宽度不小于4m；双车道通路的宽度不小于7m。",{"id":6,"name":27,"category":28,"favorite":29},"设计前期与场地设计","建筑工程",0]