[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-922773":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},922773,596,1,"单选题","",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","Ⅰ",false,{"key":16,"text":17,"correct":14},"B","Ⅱ",{"key":19,"text":20,"correct":21},"C","Ⅲ",true,{"key":23,"text":24,"correct":14},"D","Ⅳ","污水处理站规划设计要点为：(1)符合城市总体规划和排水工程总体规划。(2)在城镇水体的下游。(3)在城镇夏季最小频率风向的上风侧。(4)有良好的工程地质条件。(5)少拆迁、少占农田，有一定的卫生防护距离。(6)有扩建的可能。(7)便于污水、污泥的排放和利用。(8)有良好的交通、运输、排水和水电条件。",{"id":6,"name":27,"category":28,"favorite":29},"设计前期与场地设计","建筑工程",0]