[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-922749":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},922749,596,1,"单选题","某建设项目需要采用煤气作为能源燃料，不必收集的是哪些资料？( )",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","当地市政部门煤气供应点所能供应的煤气量、煤气压力、发热量及其化学分析",false,{"key":16,"text":17,"correct":14},"B","接管点至工程项目引入点的距离，以及接管点的坐标、标高、管径",{"key":19,"text":20,"correct":21},"C","冷凝水的排放系统设备价格",true,{"key":23,"text":24,"correct":14},"D","煤气的供应价格","《建筑设计资料集》第5集中，采用煤气能源燃料时无冷凝水的排放系统要求。",{"id":6,"name":27,"category":28,"favorite":29},"设计前期与场地设计","建筑工程",0]