[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-922699":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},922699,596,1,"单选题","下列建筑剖面图中，室外各种管线埋设顺序何者正确？( )",[11,15,18,20],{"key":12,"text":13,"correct":14},"A","",true,{"key":16,"text":13,"correct":17},"B",false,{"key":19,"text":13,"correct":17},"C",{"key":21,"text":13,"correct":17},"D","污水在下，给水次之，燃气在上，电力、电信依次靠建筑，彼此错开。",{"id":6,"name":24,"category":25,"favorite":26},"设计前期与场地设计","建筑工程",0]