[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-922620":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":9},922620,596,1,"单选题","",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","沟底纵向坡度为2%",false,{"key":16,"text":17,"correct":14},"B","变坡点间距离为50m",{"key":19,"text":20,"correct":14},"C","沟底标高为104.50m",{"key":22,"text":23,"correct":24},"D","该排水沟为有盖排水沟",true,{"id":6,"name":26,"category":27,"favorite":28},"设计前期与场地设计","建筑工程",0]