[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-922546":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},922546,596,1,"单选题","有关埋地工程管线由浅入深的垂直排序，错误的是：( )",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","电信管线、热力管、给水管、雨水管",false,{"key":16,"text":17,"correct":14},"B","电力电缆、燃气管、雨水管、污水管",{"key":19,"text":20,"correct":21},"C","电信管线、燃气管、给水管、电力电缆",true,{"key":23,"text":24,"correct":14},"D","热力管、电力电缆、雨水管、污水管","",{"id":6,"name":27,"category":28,"favorite":29},"设计前期与场地设计","建筑工程",0]