[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-922237":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},922237,596,1,"单选题","竖向规划阶段进行土石方量的估算范围，不包括以下( )项。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","场地平整土石方量",false,{"key":16,"text":17,"correct":14},"B","地面设施的土石方量",{"key":19,"text":20,"correct":14},"C","道路的土石方量",{"key":22,"text":23,"correct":24},"D","地下工程、管网、建(构)筑物基础等的土石方量",true,"《城市用地竖向规划规范条文说明》(CJJ83—99)第9.0.1\u002F9.0.2条规定，鉴于规划阶段的条件所限，其土石方量的估算范围仅包括场地平整、道路及其他地面设施的土石方量。地下工程、管网、建(构)筑物基础等的土石方不包括在内。",{"id":6,"name":27,"category":28,"favorite":29},"设计前期与场地设计","建筑工程",0]