[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-922088":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},922088,595,1,"单选题","地下室设有大型制冷机房时，制冷机的出入问题，应优先考虑的方案是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","室内楼板留吊装孔",false,{"key":16,"text":17,"correct":14},"B","电梯搬运",{"key":19,"text":20,"correct":14},"C","不考虑搬出，施工时提前搬入",{"key":22,"text":23,"correct":24},"D","外墙留孔，室外留出入口",true,"要考虑制冷机将来的更换和大修。",{"id":6,"name":27,"category":28,"favorite":7},"建筑结构与设备","建筑工程"]