[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-922010":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},922010,595,1,"单选题","热水供应系统选择的依据是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","管材、原水水质",false,{"key":16,"text":17,"correct":14},"B","热水量",{"key":19,"text":20,"correct":14},"C","热水水温",{"key":22,"text":23,"correct":24},"D","使用要求、耗热量、用水点分布情况、热源条件等",true,"热水供应系统选择应根据使用要求、耗热量、用水点分布情况、热源条件等综合考虑。",{"id":6,"name":27,"category":28,"favorite":7},"建筑结构与设备","建筑工程"]