[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-921197":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},921197,595,1,"单选题","对于砂土地基上的一般建筑，其在施工期间完成的沉降量为( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","已基本完成其最终沉降量",true,{"key":16,"text":17,"correct":18},"B","完成其最终沉降量的50%～80%",false,{"key":20,"text":21,"correct":18},"C","已完成其最终沉降量的20%～50%",{"key":23,"text":24,"correct":18},"D","只完成其最终沉降量的20%以下","根据工程实践经验，对于砂土地基上的一般建筑，可以认为其最终沉降量在施工期间已基本完成。",{"id":6,"name":27,"category":28,"favorite":7},"建筑结构与设备","建筑工程"]