[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-921059":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},921059,595,1,"单选题","挡土墙设计应重视墙后排水，所以墙后填土应尽量选用( )o",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","砂土",true,{"key":16,"text":17,"correct":18},"B","耕植土",false,{"key":20,"text":21,"correct":18},"C","膨胀土",{"key":23,"text":24,"correct":18},"D","淤泥","根据《筑地基基础设计规范》(GB50007-2002)第6.6.1条第5款，支挡结构后面的填土，应选择透水性强的填料。当采用黏性土作填料时，宜掺入适量的碎石。在季节性冻土地区，应选择炉渣、碎石、粗砂等非冻胀性填料。",{"id":6,"name":27,"category":28,"favorite":7},"建筑结构与设备","建筑工程"]