[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-920370":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},920370,595,1,"单选题","下述关于后张有粘结预应力混凝土的理解，( )正确。Ⅰ.需要锚具传递预应力Ⅱ，不需要锚具传递预应力Ⅲ.构件制作时必须预留孔道Ⅳ，张拉完毕不需要进行孔道灌浆",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","Ⅰ、Ⅲ",true,{"key":16,"text":17,"correct":18},"B","Ⅰ、Ⅳ",false,{"key":20,"text":21,"correct":18},"C","Ⅱ、Ⅲ",{"key":23,"text":24,"correct":18},"D","Ⅱ、Ⅳ","",{"id":6,"name":27,"category":28,"favorite":7},"建筑结构与设备","建筑工程"]